My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2900 - Site Mitigation Program
>
PR0522057
>
FIELD DOCUMENTS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:41 AM
Creation date
9/5/2019 2:36:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 2
RECORD_ID
PR0522057
PE
2950
FACILITY_ID
FA0015024
FACILITY_NAME
USA GASOLINE #3756
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R <br /> July 16 , 1987 � � �- <br /> AGS Job No. 87048-1 <br /> Beacon Station #675 - Lockeford, CA _ N <br /> drilling and well construction during operat-ions, conducted from <br /> June 4 through June 12 1987 . Drilling g problems _were encountered <br /> that resulted in ' two instances ofOaugers being lost .in the hole <br /> and considerable drilling delays. Four borings were drilled with <br /> a Mobile B-61 truck-mounted drill "rig operated by Datum <br /> Exploration, Inc. of Pittsburg, California. Two borings were <br /> located in the inferred downgradieInt direction from the <br /> underground tank cluster; to evaluate -potential hydrocarbon <br /> contamination .f.r.om. the tanks. A- third boring-wa-s located in the <br /> inferred upgradient direction of the underground tanks to <br /> establish background soil and -ground water quality data. The <br /> fourth boring was drilled in the inferred downgradient direction <br /> from the product lines and di's'pensers. -to` evaluate potential <br /> contamination from these sources. <br /> IWI <br /> - <br /> Steam-cleaned, - 8-inch diameter, continuous flight hollow=stem <br /> augers were used to drill borings B-1 through B-4 to a depth of <br /> approximately 81 feet. This- depthI' was considered sufficient to <br /> A <br /> installthe ground water monitoring wells . -Ground water was <br /> initially_ encountered. at approximately 65 feet below the ground <br /> 0 <br /> surface during drilling. .. Monitoring' well MW-1 -was installed in .- <br /> boring B-1 , MW-2 in boring B-2 , MW-3 in boring B-3 , and MW-4 in <br /> boring B-4 . Locations of monitoring wells at the site are shown <br /> q <br /> on the Generalized Site Plan. <br /> Aioiv/led GeoSystems- _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.