Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> MS-94-14 <br /> RECOMMENDATIONS: <br /> 1. The Parcel Map requirement is waived. <br /> 2 . The Traffic Impact Mitigation Fee will be required when <br /> parcels are developed. The fee is due and payable at the time <br /> of building permit application. (The fee currently is <br /> $1,767 . 00 per single family dwelling unit in the Tracy area. <br /> The fee shall be automatically adjusted July 1 of each year by <br /> the Engineering Construction Cost Index as published by the <br /> Engineering News Record. ) <br /> (Resolution R-90-304, R-91-1025) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />