Laserfiche WebLink
Soil Suitability Study - Parcel Map No . (MS-92-94 ) Cont . <br /> Parcel 1 had a percolation rate of 35 minutes <br /> per inch and Parcel 2 had a percolation rate <br /> of 30 minutes per inch. <br /> Recommendations <br /> It is recommended that a mound system be <br /> designed for any additional septic systems <br /> installed . <br /> Engineer ' s Statement <br /> Septic systems can be installed to the density <br /> proposed and it is not expected to impact <br /> groundwater nor cause other health hazards if <br /> a properly designed mound system is constructed . <br /> Dwain C. Tosch <br /> Attachments : <br /> Detail Map <br /> Percolation Field Note Sheet <br /> S4S// �1, <br /> r <br /> 2-D NO. 14644 � • <br /> c EXP. <br /> ,hex , CMN- Oc��4 <br />