My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
24500
>
2600 - Land Use Program
>
PA-0500776
>
SU0006024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:02 AM
Creation date
9/6/2019 9:54:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006024
PE
2656
FACILITY_NAME
PA-0500776
STREET_NUMBER
24500
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
APN
25024001
ENTERED_DATE
5/5/2006 12:00:00 AM
SITE_LOCATION
24500 S MACARTHUR DR
RECEIVED_DATE
5/3/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\24500\PA-0500776\SU0006024\APPL.PDF \MIGRATIONS\M\MACARTHUR\24500\PA-0500776\SU0006024\CDD OK.PDF \MIGRATIONS\M\MACARTHUR\24500\PA-0500776\SU0006024\EH COND.PDF \MIGRATIONS\M\MACARTHUR\24500\PA-0500776\SU0006024\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-05=776 (SA) <br /> . 2 The driveway:approach shall be improved in accordance with the requirements of San Joag6in,County;- <br /> Standards CW=1 L or.CW-12 prior to issuance of the occupancy permit. <br /> (Development_Title Section 9-1145.5) W <br /> 3. ` The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application, (The fee currently is $1,057.00 per 1,000 gross square foot of building <br /> designated as Warehouse in the Tracy area. The fee shall be automatically adjusted July 1 of each year by . <br /> the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the'Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall he obtained from the Solid Waste Division (468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. Applicant shall obtain a Storm Water Pollution Prevention Plan (SWPPP)permit from the State Water <br /> Resources Control Board prior to beginning on any construction. <br /> Note: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:SH:ar <br /> {- PACOMMENTMSAWR 2005TA-0500776.wpd <br /> { <br /> I4 <br /> S <br /> j <br /> { x <br /> 1 . <br /> 11 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.