Laserfiche WebLink
-z- <br /> Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-03-88 (SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $190.77 per <br /> additional daily trip-end generated in the Tracy area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of <br /> soil shall require a State NPDES construction permit. <br /> DTP:BN:ar <br /> P TOI^MWSs Aim zMTAn 30WSS .yc <br />