My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30350
>
2600 - Land Use Program
>
QX-80-0001
>
SU0004990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2019 9:37:33 AM
Creation date
9/6/2019 9:55:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004990
PE
2605
FACILITY_NAME
QX-80-0001
STREET_NUMBER
30350
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
APN
25313002-3, &
ENTERED_DATE
4/13/2005 12:00:00 AM
SITE_LOCATION
30350 S MACARTHUR DR
RECEIVED_DATE
4/12/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\30350\QX-80-0001\SU0004990\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED CONDITIONS OF OPPROVAI <br /> QX-80-0001 <br /> Lone Star Aggregates <br /> Revisions of Approved Actions for Quarry Excavation Application No. QX-80-0001 was approved by <br /> the San Joaquin County Planning Commission on June 2, 2005. The effective date of approval is <br /> June 12, 2005. <br /> 1. U.S.SOIL CONSERVATION SERVICE(SCS) <br /> The applicant shall submit to the Planning Division and thereafter implement an SCS-approved <br /> revegetation plan prior to the commencement of Phase II excavation. The plan shall be submitted no <br /> later than thirty(30)days from the date of application approval. <br /> 2. CALIFORNIA DIVISION OF MINES AND GEOLOGY <br /> A reclamation plan for post-1976 excavation activities shall be approved by the Division of Mines and <br /> Geology prior to the commencement of Phase II excavation but in no case later than sixty(60)days from <br /> the date of application approval. <br /> 3. CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> The applicant shall submit to the Planning Division verification that the project has received all necessary <br /> plan, permit, or program approvals from the Regional Water Quality Control Board. This information shall <br /> be submitted prior to the commencement of Phase II excavation but in no case later than sixty (60) days <br /> from the date of application approval. <br /> 4. PLANNING DIVISION <br /> a. The applicant shall submit to the Planning Division an annual, written report prepared by a licensed <br /> civil engineer. This report shall describe the Phase II compliance status relative to the requirements <br /> of the County Planning Title and to the conditions of approval adopted as part of this permit approval. <br /> The report shall also describe the excavation and rehabilitation completed in the preceding twelve <br /> (12) month period. This first report shall be submitted April 1, 1987. <br /> b. Soil removed from the slopes of the existing pit shall be placed in the area known as Pit G, which <br /> contains approximately forty (40)acres. Pit G shall be refilled, graded, and reseeded at the original <br /> ground level within thirty (30) days of application approval. The applicant shall submit to the <br /> Planning Division a plan and map for rehabilitation of the Pit G area. <br /> c. Quarry operations may be conducted Monday through Saturday between the hours of 5:00 a.m. and <br /> 12:00 a.m. The processing plant may operate 24 hours per day, Monday through Saturday, as <br /> shown on the site plan dated April 27 2005- <br /> d. Temporary and final slopes with a maximum steepness of 1:5:1 (horizontal-to-vertical) may be <br /> established. <br /> 1F• <br />
The URL can be used to link to this page
Your browser does not support the video tag.