Laserfiche WebLink
Implementing Timing of <br /> Mitigation Measure Method of Verification 1 Party Verification Monitoring Party <br /> erosion-control measures to <br /> prevent silt runoff to public <br /> roadways from sites with a <br /> -i-na greaterthan 1 percent <br /> -Ing ;round-disturbing <br /> Wind Breaks: The construction <br /> contractor shall install and <br /> maintain wind breaks at <br /> windward side(s) of <br /> construction areas throughout <br /> construction activities. <br /> High Winds: The construction <br /> contractor shall suspend <br /> excavation and grading activity <br /> when winds exceed 20 miles <br /> per hour. <br /> Construction Equipment <br /> All off-road construction equipment <br /> used within project area shall conform <br /> to the United States Environmental <br /> Protection Agency's Tier 3 or higher <br /> emissions standards. The construction <br /> contractor shall be made <br /> aware of this requirement prior to the <br /> start of construction activities. Use of <br /> Tier 3 or higher off-road construction <br /> equipment shall be stated on all <br /> grading plans. The construction <br /> contractor shall maintain a list of all <br /> operating equipment in use on the <br /> project site. The construction <br /> equipment list shall state the makes, <br /> models, and numbers of construction <br /> equipment onsite and shall be made <br /> available, upon request, to the San <br /> Joaquin Valley Air Pollution Control <br /> District. <br /> The construction contractor shall <br /> properly service and maintain all <br /> construction equipment in accordance <br /> with the manufacturers <br /> recommendations. <br /> dusters. The a following mitigation will <br /> be required: <br /> • Building doors shall be closed when <br /> not receiving materials. <br /> • Loaded transfer vehicles shall be <br /> covered and properly maintained to <br /> ensure that both liquid and solid <br /> waste materials are contained <br /> 17 <br />