Laserfiche WebLink
PA-0800005 1 Page 3 <br /> 30703 S. MacArthur Drive, Tracy <br /> K. The Project Description proposes to increase traffic to 1727 vehicles per day. The project <br /> description did not reference or provide a traffic study to support the proposed numbers. <br /> L. The Biomass Gasification Unit proposes to use 40 TPD of processed clean wood waste to <br /> generate 1 mega-watt/hour of energy for on-site use. The EHD needs more information on <br /> construction and operation of the biomass gasification unit and on the operation of clean <br /> wood waste recovery from the mixed C&D processing facility. Proper evaluation for this <br /> facility from the San Joaquin Valley Air Pollution Control District is required. <br /> M. Expand the outdoor green waste processing operations to allow the processing of co- <br /> collected residential green waste with food waste, to produce compost feedstock and/or <br /> anaerobic digestion feedstock. The EHD will need more information on additional <br /> reasonable measures to minimize odors, including feedstock characteristics and quality, and <br /> OIMP. <br /> N. The phased approach to this project does allow the facility to incrementally increase the <br /> capacity of the facility. The first phase of the project appears to be suitable for the size of the <br /> facility. The Environmental Health Department (EHD) has concerns regarding the second <br /> phase of the proposed project. Prior to implementing the second phase of the proposed <br /> project the proponent must conduct a operational analysis based on real time conditions at <br /> the site. Based the review of the operational analysis the EHD may require additional <br /> equipment, q iI ' g lanes and changes to onsite traffic patterns to insure safe operation of <br /> the facility, prior to the approval of Phase II. The operational analysis must be approved 180 <br /> days by the EHD prior to making application for a revised Solid Waste Facility Permit. <br />