Laserfiche WebLink
Project Description—Construction & Demolition/Inert Debris Facility Report <br /> Tracy Materia/Recovery Facility and Transfer Station <br /> 30703 S. Mac4rb5ur Drive, Tracy, Califomia 95377 <br /> Schematic Drawing of Buildings and Structures and Operations Area <br /> !a <br /> The Site Pians containing, the tentative parcel map, the schematic drawings of <br /> buildings and other structures showing the layout and general dimensions of the <br /> operations areas, including the unloading, storage and loading areas are <br /> Provided Appendix A. Complete plans for future buildings and equipment <br /> installation will be submitted with the corresponding building permit applications, <br /> prior to construction, where applicable. <br /> Descriptive Statement of Facility Activity <br /> �I <br /> { Existing Activities <br /> Tracy MRF and TS operates a construction & demolition (C&D) Debris <br /> Processing Area adjacent to the Transfer Station building, on the east side on <br /> asphalt-concrete surface. The area is a quadrant of a semi-circle with an 80 feet <br /> radius comprising an operational area of approximately 2,500 square feet. The <br /> facility currently processes up to 175 tons per day (TPD) of mixed C&D per day. <br /> An Inert Processing Area is located just west of the Compost <br /> pad ong the <br /> access road, in the, northwest area of the facility. The size of the pad sI 50 feet <br /> wide and 200 feet long and does not exceed 20 feet in height with 1:1 side <br /> slopes. The total volume of the inert stockpile will not exceed 4,000 cubic yards <br /> at any one time. The facility currently processes an average 35 TPD of inert <br /> materials per day. ;I <br /> P . <br /> _ r4nosed Activit�eNs Overview <br /> The C&D and Inertf(CDI) processing activities proposed at the expanded facility <br /> will b p <br /> e phased in as rev' Y <br /> previously discussed, in accordance with the description of <br /> operations and tonnage limits set forth in the following section. and summarized <br /> in Table 1: : <br /> A <br /> Table 1 - Proposed Activities Overview <br /> I Phase Average Description <br /> Tonnage <br /> 200 TPD Inert Debris Recycling expanded to additional one acre <br /> < �r ad in northwest corner of site. <br /> C&D operations area expansion and relocation to <br /> 200 TPD southeast corner of site. <br /> t utilizin floor-sort technology) <br /> Phase 1 <br /> Subtotal 400 TPD <br /> 2 400 TPD <br /> Tonnage increase following C&D processing upgrade <br /> utilizingmechanized pick line technology <br /> Total 600 TPD Combined peak CDI processing capacity <br /> i <br /> I <br /> Z 170.18 CDI FacReport 121907.doc <br /> i <br /> :f <br /> f <br />