Laserfiche WebLink
Item No.2 <br /> PC: 12-16-93 <br /> ER-93-INP-93-4 <br /> I Page 6 <br /> the wood rem yard waste processing and composing area,Wd pa refuse tipping,sorting and <br /> pig will take place wkhin•the 38 fool`-deep activated pit. <br /> There are two primary types of land uses In the area surrounding the project site, gravel mining <br /> and ..-Um Star 1pil0flnopeaes at sand arad grvral fae tty west of the site, <br /> WRh TeWwrt Aggigides7opomtkV a si ft facifty to to north Directly across MacArthur Drive <br /> to.the:vest am amharde,arA a IW pity usedlor•row crop The,property to the south <br /> ,of <br /> the alta IR �:end: tomer laftd tamae`Jrtthe errN�dud�a flakes of raw crops and <br /> the Mrs St mp.end ReWc" try to tlRte-weal+ The MMM-Carbona Irrigation District <br /> canal runs akxtg ljla western boutxiary of the slits. Corral HoNow Creek is also located north of <br /> the sae. <br /> There are low residences in the project-area- The doom are the two mobile homes located <br /> aayss MacArthur Drive,approximately 600 feet northeast of the site. There is also one residence <br /> a f. <br /> IA MON MM of g aka on tM west We of MacArthur Drive. There are also <br /> scattered residermm at the Irversectlon d lirtnd Road and MaWVthur Drive, north of the site. <br /> Tie Fk*EIR wed that the p mject is tfat lik*to create land use conflicts with surrounding <br /> f uses, :MWW" W MWjMq MMWftm The project will be enclosed with a <br /> skc foot-higti chats-link fence and Jarxbooped aMM'NhwAr hex DOn. Also,except for the wood <br /> MW yard waste pro ng and oompostfrtg,ail other opwations;will take place inside the transfer <br /> stoWn buldbig::.Thle,:COTUWoed wkhh ms's 100 1 fn the bottom of ft 30400t-deep pit, <br /> mWmiae land use <br /> Property owners M the area were maked notices of Draft EIR avake6ility, as wen as project <br /> referrals. No comments from ndVtK#e were Fetaiiued on ate Draft 8R., and no comments <br /> regarding the Draft E1R were made by the one neighboring property owner present at the hearing <br /> on the Draft:Ella. <br /> T i <br /> The Final EIR prepared for the project did not identify any significant traffic related impacts. The <br /> proposed Project Is expected to generate approximately 500 dally trips initially and approximately <br /> 1,100 dally trips in 2010. Since the trips will likely be dispersed over an entire day, accordng to <br /> the FEIR there is little relative impact to other users of the local transportation system. <br /> FACT ES E CES: <br /> D.a9e: <br /> Storm water runoff from an areas except the wood storage and yard.waste composting area will <br /> drain to an on-site retention pond Storm water runoff from the wood storage_and yard waste <br /> l compost area will drain to an on ske luted evaporation pond Water used for periodic wash down <br /> l of the transfer station floor will be collected and directed to holding tanks for temporary storage <br /> until pumped out and hauled off the site for disposal. <br />