Laserfiche WebLink
Rem NO. 2 - <br /> PC: 12-16-93 <br /> ER-93-1/Up-93-4 <br /> Page 21 <br /> ATTACHMENT C <br /> MITIGATION MONITORING PROGRAM FOR THE <br /> TRACY MATERIALS RECOVER AND TRANSFER FACILITY <br /> (For Significant Impacts Only) <br /> !_and_Use and Planning Policy <br /> Mimmation Measure: N a bird hazard_is_identified ..the anoikam will be required to pravide <br /> mrtiaatiM such as rtetliM a noise system. or g ft mgrs to ward Off girds. as Mguired tay,,,the <br /> A___px _ort Land Use C-0m i. <br /> Monitoring ReauErement: Periodic insoec:tbE6 <br /> PeM2aLAgeaa R m <br /> EDMQI <br /> Timing or F Mon <br /> Vegetation and Wildlife Resources <br /> Mftigation Measure: Witin3A Not more than 60 days prior to construaion,the apposaFAs chap <br /> Fawn a professional biologist retained by the aoolicant shall to conduct a preconstruction survey <br /> of the site for the presence of the San Joaquin kh fox. If any kit foxes are found, precautions <br /> specified in Chapter 4.2, Condition 4.2.4,Rthe Final E1R shall be taken. <br /> MonkoriLig Requirement: Review of survey results prior to construction. <br /> Pe%orjAgency Responsible: San Joaquin County Community Development, California <br /> Department of Fish and Game PFG), U.S.Fish and Wildlife Service. <br /> Timing Or Frequency of Monitoring: Within 39 60 days of construction. <br /> MenkgFiRe Re <br /> Mitigation Measure: <br /> N; BUFFGWPRS Not more than 60 days orior to construction a <br />