Laserfiche WebLink
COPY <br /> GENERAL CONSIDERATIONS <br /> 1_ Does it appear that any environmantal feature of the project- <br /> Will generate significant public concern or controversy? � <br /> I <br /> { ) Yes (X) No Nature -of concern(s) : JUL JC_ <br /> 2. Will the project require approval or permits by agencies other <br /> than the County? (}�) Yes ( ) No <br /> Agency name(s) : <br /> 3 : Is the project within the Sphere of Influence, or within two <br /> miles, of any city? <br /> ( ) Yes (X) No City: <br /> ENVIRONHMMAL IMPACTS: <br /> "Yes" may only be checked in situations. whera;thera is substWtLaie�r ,denee to <br /> Indicate that ,theta may 15e a siguLficant adverse impar ,on the environment if <br /> there is no change in the projeO des=iptiaa. (C?O* Sec' <br /> See <br /> See the "Discussion' section at the end of the.Initial Study for explanation of <br /> any _sssoac=s checked "yes", or any "No" answer marked with an asterisk (�} . <br /> sources. The following sources of information have been used in determining <br /> environmental impacts: <br /> original source materials and . maps on * � in the Community Develorlient <br /> Deoax�`_ment ?ncludinq: a-1 ,County rand CJty%.ge1&st_a1. plans and community plans; <br /> assessor parcel books; various local and.FMh flood zona maps; service dist---met <br /> maps; maps of geologic instabilit- <br /> y; maps and reports an endangered species such <br /> as the Natural Diversity Data Base; noise. eontocr mous; spec�Lfic roadway plans; <br /> macs and/ox records of archeological/histMic resoazces; sail reports and maps; <br /> etc_ Many of these original. soaree eater<_sls have .been collected from other <br /> public agencies or from prwriously preyaa Zn,.s and other technical studies. <br /> Addltional standard sources which should be spec?ficall, cited below include <br /> on-site visits by staff (note data); staff ;cnowiedge or exile=_ante; and . <br /> Lidenendent environmental studies submitted to the countv as na_rt of the project- <br /> (note <br /> roject(note report title, date, and consultant) . <br /> - Y S No <br /> I. ER <br /> a.. is any portion of the project <br /> subjec4t to flood hazard? _>11 <br /> Flood zone �C <br /> Initial Study (ReV:0 /9Z) <br /> 2 <br />