Laserfiche WebLink
C.(D <br /> PY.' <br /> : . <br /> Other sources used: <br /> 7. Hazards: <br /> a. Will the project create a risk of <br /> explosion; release, generate or <br /> store any hazardous substances; or <br /> cause other dangers to public health <br /> and safety? <br /> b- Are there any known hazardous <br /> substances located within soo feet of <br /> the boundaries of this project, if in <br /> an existing or proposed residential <br /> area (this could include possible <br /> groundwater contamination)? <br /> C. Will the project result in ` <br /> interference with, or need for, <br /> .emergency plans? <br /> Other sources used: <br /> 8. Utilities and Public Service- <br /> a. <br /> e . ice.a. Will the project require alteration of, <br /> addition to, or the need for new utility <br /> systems (water, sewer, drainage, solid <br /> waste) , including a Sphere of Influence <br /> or district boundary change? <br /> ** b- will the project result in the' <br /> need for or the expansion of the <br /> following services: fire and police <br /> Protection, schools, parks and <br /> recreation, libraries, roads, flood <br /> cant-rol, solid waste or other public <br /> works facilities, public transit, or <br /> governmental' services? <br /> C. Wi11 the project adversely impact <br /> existing recreational/park <br /> opportunities or require new <br /> park/recreation opportunities? <br /> Note! __ "Yes- answers to these two questions and 9 (b) below <br /> wiil zequI=e additionar discussion, but do not necessarily <br /> zadicate a potentially significant impact. <br /> l <br /> nit_al Study <br /> (Rev: Qi/9 i} <br /> a <br />