My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004113
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACKVILLE
>
23405
>
2600 - Land Use Program
>
QX-99-0002
>
SU0004113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 11:19:21 AM
Creation date
9/6/2019 9:56:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004113
FACILITY_NAME
QX-99-0002
STREET_NUMBER
23405
Direction
N
STREET_NAME
MACKVILLE
STREET_TYPE
RD
City
CLEMENTS
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
23405 N MACKVILLE RD
RECEIVED_DATE
10/26/1999 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MACKVILLE\23405\QX-99-02\SU0004113\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> QX-99-2 <br /> 3. A video tape of road conditions along the haul route, including but not limited to,Mackville Road from <br /> the entrance is required prior to the start of excavation. The condition of Mackville Road and along <br /> haul route shall be reviewed with the Department of Public Works prior to the start of excavation and <br /> prior to the beginning of each phase. <br /> 4. A bond or cash deposit in the amount acceptable to the Department of Public Works shall be filed with <br /> the Department with a guarantee that, if the permittee fails,refuses or neglects to repair, under permit, <br /> any damages to the haul route, including but not limited to,Mackville Road which may result from <br /> the permittee's operations,the Department of Public Works may do the work necessary to restore <br /> Mackville Road equal to,or better than, its original condition, using the funds from the bond or cash <br /> deposit. <br /> 5. The Traffic Impact Mitigation Fee will be required for this development. The Fee is due and payable <br /> at the time of excavation plan approval. The Fee currently is $151.36 per additional daily trip-end in <br /> the Lockeford area. The Fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. The number of trip-ends may <br /> be determined by a proportion to the length in time of the excavation operation. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179,R-95-650 and R-96-592) <br /> 6. An encroachment permit shall be required for work within the road right-of-way. <br /> (Development Title Section 9-1145.4) <br /> GK:RWH:gn <br /> Ps-9Kon-mu <br /> E: Manuel Lopez,Deputy Director/Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.