Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> GEORGE REED, INC. <br /> Revised Conditions <br /> Revisions of Approved Actions application No. QX-99-0002 was approved by the San Joaquin <br /> County Planning Commission on January 15, 2015. The effective date of approval is January 27, <br /> 2015. This approval will expire on December 31, 2017, unless (1) all Conditions of Approval have <br /> been complied with, (2) all necessary building permits have been secured and remain in force, and <br /> (3) all necessary permits from other agencies have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be <br /> fulfilled prior to the establishment of the use and the issuance of any building permits. Those <br /> Conditions followed by a Section Number have been identified as Ordinance requirements <br /> pertinent to this application. Ordinance requirements cannot be modified, and other Ordinance <br /> requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: John F!nderburg, 468-3160) <br /> a. APPROVAL: This approval shall be for a phased 415-year excavation and reclamation of the 69.5- <br /> acre portion of the 96-acre project site, as-shown on the moved Revised Mining and Reclamation <br /> Plan dated ^i! 7, 1999 October 1,_2014. The Rein ate;,PlaR—t8A is attar.techs Exhibit A. <br /> Reclamation shall be consistent with the revised Reclamation Plan dated October 1. 2014 and <br /> completed by December 31, 2017. <br /> b. IMPROVEMENT PLAN: The Improvement Plan shall be prepared by a registered Civil Engineer <br /> and show drainage, driveway access details, on-site parking, existing and proposed utility services, <br /> grading, and reclamation. A Plan Check fee as specified by Section 9-240 will be required. The <br /> Mining and Reclamation Plan shall be prepared in accordance with the reclamation standards <br /> developed pursuant to the Surface Mining and Reclamation Act (SMARA) Section 2773(b) and <br /> approved by all agencies with permit authority prior to initiating the use. <br /> c. STOCKPILING: No stockpiled soil or material shall be placed closer than twenty-five (25) feet to a <br /> property boundary. (Development Title Section 9-1415.3[b]) <br /> d. PRIVATE ROADS: All private roads involved in an excavation shall be maintained so as to control <br /> the creation of dust. The first one hundred (100) feet of any private road on the property which <br /> intersects with a publicly maintained road shall be surfaced in a manner approved by the Director. <br /> Traffic-control and warning signs shall be installed, if required, at such intersection. The placement <br /> and size of these signs shall be approved by the Director of Public Works. (Development Title <br /> Section 9-1415.3[c]) <br /> e. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion. An erosion and sediment control plan <br /> approved by Development Services Division shall be part of the reclamation plan. (Development <br /> Title Section 9=1415.3[d]) <br /> f. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be met unless <br /> otherwise modified by conditions of the Quarry Excavation Permit. Development Title Section 9- <br /> 1415.3[e]) <br /> (1) All equipment used at the site will be equipped with state-of-the-art noise shielding and muffling <br /> devices to minimize noise from the operation of the equipment. <br />