My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010285
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACKVILLE
>
23627
>
2600 - Land Use Program
>
QX-99-0002
>
SU0010285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:29 AM
Creation date
9/6/2019 9:57:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010285
PE
2656
FACILITY_NAME
QX-99-0002
STREET_NUMBER
23627
Direction
N
STREET_NAME
MACKVILLE
STREET_TYPE
RD
City
CLEMENTS
APN
01922043 44
ENTERED_DATE
11/4/2014 12:00:00 AM
SITE_LOCATION
23627 N MACKVILLE RD
RECEIVED_DATE
11/3/2014 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACKVILLE\23627\QX-99-0002\SU0010285\APPL.PDF \MIGRATIONS\M\MACKVILLE\23627\QX-99-0002\SU0010285\CDD OK.PDF \MIGRATIONS\M\MACKVILLE\23627\QX-99-0002\SU0010285\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN - QX-99-02 (REVISED) <br /> George Reed, Inc. <br /> Page Three <br /> The environmental impacts to the County Park located north of the project site is not <br /> significant due to the 2500' abutment to the park, which is minimal in comparison with <br /> the total project. Most patrons use the park on weekends or evenings during the summer <br /> when there is no activity within the project area. Most people visiting the park are <br /> utilizing the north area of the park along the river and away from the project activity <br /> when excavation occurs. Excavation of five acres along the park boundary should <br /> take approximately 6 months of the total 17 year project which is not a significant <br /> impact in evaluating the total project. With dust control, required noise levels on <br /> equipment, the 25' setback and required slopes; impacts to the park from the <br /> project activity should be less than significant. <br /> II. DESCRIPTION OF PROPOSED MINING OPERATION: <br /> A. MAP OF OPERATIONS: Details of the proposed mining operation are shown on <br /> map attached to the application. <br /> B. PRODUCTION SCHEDULE: <br /> PHASE I: Product Completion Reclamation <br /> 35 Acres 894,000 TNS S/G 2006 2008 <br /> 439,000 CY O/B <br /> PHASE II: <br /> 40 Acres 1,043,000 TNS S/G 2015 2017 <br /> 497,000 CY OB <br /> PROJECT TOTALS: 1,937,000 TNS S/G <br /> 936,000 CY OB <br /> NOTE: Annual Average Mining Quantities: <br /> 4.5 Acres/Year <br /> 93,600 CY Overburden <br /> 193,700 TNS Sand & Gravel <br />
The URL can be used to link to this page
Your browser does not support the video tag.