Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> QX-99-2 <br /> George Reed, Inc. <br /> Quarry Excavation Application No. QX-99-2 was approved by the San Joaquin County Planning <br /> Commission on December 7, 2000. The effective date of approval is December 17, 2000. This <br /> approval will expire on June 18, 2002, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be <br /> Z <br /> ulfilled prior to the establishment of the use and the issuance of any building permits. Those <br /> Conditions followed by a Section Number have been identified as Ordinance requirements pertinent <br /> to this application. Ordinance requirements cannot be modified, and other Ordinance requirements <br /> may apply. <br /> 1. COMMUNITY DEVELOPMENTDEPARTMENT (Staff Contact: Tina Wehrmeister, 468-8477) <br /> a. APPROVAL: This approval shall be for a phased 4-217-year excavation and reclamation of the <br /> 69.5-acre portion of the 79-acre project site, as shown on the approved—amended Mining and <br /> Reclamation Plan datedpi p,it 7.!9990ctober 1, 2014. The Reclamation Plan text is attached as <br /> Exhibit A. <br /> b. IMPROVEMENT PLAN: The Improvement Plan shall be prepared by a registered Civil Engineer <br /> and show drainage, driveway access details, on-site parking, existing and proposed utility services, <br /> grading, and reclamation. A Plan Check fee as specified by Section 9-240 will be required. The <br /> Mining and Reclamation Plan shall be prepared in accordance with the reclamation standards <br /> developed pursuant to the Surface Mining and Reclamation Act (SMARA) Section 2773(b) and <br /> approved by all agencies with permit authority prior to initiating the use. <br /> c. STOCKPILING: No stockpiled soil or material shall be placed closer than twenty-five (25) feet to a <br /> property boundary. (Development Title Section 9-1415.3[b]) <br /> d. PRIVATE ROADS: All private roads involved in an excavation shall be maintained so as to control <br /> the creation of dust. The first one hundred (100) feet of any private road on the property which <br /> intersects with a publicly maintained road shall be surfaced in a manner approved by the Director. <br /> Traffic-control and warning signs shall be installed, if required, at such intersection. The placement <br /> and size of these signs shall be approved by the Director of Public Works. (Development Title <br /> Section 9-1415.3[c]) <br /> e. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion. An erosion and sediment control plan <br /> approved by Development Services Division shall be part of the reclamation plan. (Development <br /> Title Section 9-1415. 3[d]) <br /> f. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be met unless <br /> otherwise modified by conditions of the Quarry Excavation Permit. (Development Title Section <br /> 91415.3[e]) <br /> (1) All equipment used at the site will be equipped with state-of-the-art noise shielding and muffling <br /> devices to minimize noise from the operation of the equipment. <br /> Conditions of Approval - 1 - QX-99-2 <br />