My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008458
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACKVILLE
>
23813
>
2600 - Land Use Program
>
PA-0200182
>
SU0008458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:31 AM
Creation date
9/6/2019 9:57:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008458
PE
2656
FACILITY_NAME
PA-0200182
STREET_NUMBER
23813
Direction
N
STREET_NAME
MACKVILLE
STREET_TYPE
RD
City
CLEMENTS
APN
01922040
ENTERED_DATE
9/28/2010 12:00:00 AM
SITE_LOCATION
23813 N MACKVILLE RD
RECEIVED_DATE
9/28/2010 12:00:00 AM
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0008458\APPL.PDF \MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0008458\CDD OK.PDF \MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0008458\EH COND.PDF \MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0008458\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> G <br /> GEORGE REED, INC. <br /> APPLICATION ā REVISIONS OF APPROVED ACTIONS <br /> REVISION TO PENT No. PA-02-182 <br /> Application Attachment <br /> 2. State the facts showing the changes in circumstances which make the subject condition(s) no <br /> longer appropriate or necessary: <br /> Condition No. 1gā <br /> The timeline reallocation request for the mine life has become necessary due to the current depressed <br /> market conditions for construction grade aggregate materials. <br /> Condition No. La.ā <br /> Clarify within the Reclamation Plan that the approved flood protection berm identified in the <br /> Conditional Use Permit and Reclamation Plan will be constructed utilizing overburden from initial <br /> stripping in the newly designated first phase. The berm construction will be completed prior to mining <br /> within the FEMA designated 100 and 500 Year floodplains. The soil from the first phase placed in the <br /> section of the berm along the western property line will be utilized in the last phase of reclamation. <br /> The berm will comprise approximately 30,000 yards of soil, approximately 0.2 (two-tenths) of a foot <br /> over the 89 acre mine site, which will not affect preceding reclamation elevations or objectives. <br /> Condition No. 2.a.{1)ā <br /> Clarify the topsoil stockpile setback has an exception for stockpiles which function as a flood <br /> protection berm as identified in the approved Reclamation Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.