My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010493
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACKVILLE
>
23813
>
2600 - Land Use Program
>
PA-0200182
>
SU0010493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 11:51:19 AM
Creation date
9/6/2019 9:57:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010493
PE
2656
FACILITY_NAME
PA-0200182
STREET_NUMBER
23813
Direction
N
STREET_NAME
MACKVILLE
STREET_TYPE
RD
City
CLEMENTS
APN
01922040
ENTERED_DATE
5/19/2015 12:00:00 AM
SITE_LOCATION
23813 N MACKVILLE RD
RECEIVED_DATE
3/7/2024 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0010493\APPL.PDF \MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0010493\CDD OK.PDF \MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0010493\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conveyed via pipes or other acceptable conveyance to the toe of slope . The spacing of <br /> collection points shall be no greater than 1 , 500 feet . Each reclaimed final slope face that <br /> has terracing shall have a minimum of one ( 1 ) down drain . The method of transporting <br /> the water along the flow line of the terrace to the down drain , so as to prevent erosion and <br /> possible slope failure , shall be approved by the Development Services Division . <br /> The method of drainage of terraces for temporary slopes at setback lines shall be submitted <br /> to Development Services Division for approval . <br /> ( 3 ) Slope Stability Factors of Safety . When required in this Title to provide site -specific geologic <br /> and engineering slope stability analysis , the following minimum slope stability factors of <br /> safety shall apply : <br /> A . A minimum factor of safety of 1 . 5 against static deep seated failure . <br /> Be A minimum factor of safety of 1 . 5 against static surficial failure . <br /> C . A minimum factor of safety of 1 . 1 against seismic failure . <br /> (4 ) Temporary Cut Slopes at Setback Lines . Temporary cut slopes ( i . e . , for limited periods of <br /> time , slopes that are in the process of extraction prior to being backfilled ) at setback lines shall <br /> not exceed one ( 1 ) foot horizontal to one ( 1 ) foot vertical , except that temporary cut slopes at <br /> setback lines to a maximum of one half ( 1 /2 ) of a foot horizontal to one ( 1 ) foot vertical may <br /> be maintained if site - specific geologic and engineering analysis demonstrate through a slope <br /> stability analysis that the proposed temporary cut slopes will have a minimum slope stability <br /> factor of safety as required in Section 9 - 1415 . 3 ( k) ( 4) . However , in the event that there are <br /> existing structures on the adjacent property ( or the immediate potential for structures on the <br /> adjacent property) , the excavation shall at no time be closer to the property line than a line <br /> projected on a slope of one ( 1 ) to one ( 1 ) from the property line to the toe of slope . <br /> ( 5 ) Final Slopes . Final cut and/or fill slopes shall not exceed two ( 2 ) feet horizontal to one ( 1 ) <br /> foot vertical , except as specified below : <br /> A . Final slopes to a maximum of one and one - half ( 1 1/2) feet horizontal to one ( 1 ) foot vertical <br /> may be maintained when site - specific geologic and engineering analysis demonstrate <br /> through a slope stability analysis that the proposed final slopes will have a minimum slope <br /> stability factor of safety as required in Section 9 - 1415 . 2 ( k) ( 4) , while demonstrating <br /> suitability for the proposed end use and protecting against erosion ( by means of <br /> revegetation or other methods approved by Development Services Division ) . <br /> ( 6 ) Fill Slopes . Fill slopes shall be constructed consistent with recommendations from a <br /> qualified civil/geotechnical engineer based upon site - specific geologic conditions . <br /> n . FENCING : Fencing four ( 4 ) feet in height consisting of not less than three ( 3 ) strands of barbed <br /> wire , or an approved equivalent , shall be placed around the excavation area where slopes steeper <br /> than two ( 2 ) feet horizontal to one ( 1 ) foot vertical are maintained . Six ( 6 ) foot high security fencing <br /> or an approved equivalent shall be required where slopes steeper than two (2 ) feet horizontal to <br /> one ( 1 ) foot vertical are created , if the proximity of such slopes to residential uses or other uses <br /> involving a concentration of people so warrants . ( Development Title Section 9 - 1415 . 3 [ 1] ) <br /> o . PONDING : All water utilized in the plant operation shall be disposed of behind a closed dike . <br /> ( Development Title Section 9 - 1415 . 3 [ n ] ) <br /> p . EXCAVATION / RECLAMATION SCHEDULE : The reclamation plan shall show the phases of <br /> excavation . Reclamation on one phase of an excavation shall be initiated prior to the start of the <br /> next excavation phase . The final reclamation of any phase of excavation shall be completed within <br /> PA- 0200182 — Conditions of Approval 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.