My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003074
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MADRUGA
>
200
>
2600 - Land Use Program
>
SA-93-42
>
SU0003074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:39 AM
Creation date
9/6/2019 9:58:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003074
PE
2633
FACILITY_NAME
SA-93-42
STREET_NUMBER
200
Direction
E
STREET_NAME
MADRUGA
STREET_TYPE
RD
City
LATHROP
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
200 E MADRUGA RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MADRUGA\200\SA-93-42\SU0003074\APPL.PDF \MIGRATIONS\M\MADRUGA\200\SA-93-42\SU0003074\CDD OK.PDF \MIGRATIONS\M\MADRUGA\200\SA-93-42\SU0003074\EH COND.PDF \MIGRATIONS\M\MADRUGA\200\SA-93-42\SU0003074\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quailemotles <br /> Albany weathers the storm by Carolyn Hardy Olsen,a com- <br /> After heavy rains flooded por- pany vice president,last year <br /> Lions of Georgia this summer, when she assisted the city of Des <br /> Brown and Caldwell helped the Moines when its treatment plant <br /> city of Albany get its wastewater flooded.Electrical and mechani- <br /> treatment plant and the con- cal engineering staff from the <br /> struction of the plant's expansion company's Atlanta office also <br /> back up to speed. provided support. <br /> When the deluge started Although the floodwater has <br /> July 4,the city was in the middle receded and both the plant and <br /> of a wastewater treatment plant construction are back on track, <br /> expansion with Brown and the effects of the flood still <br /> Caldwell as the construction linger. "The neighborhood of <br /> manager and Alcon Associates the plant is like a ghost town;' <br /> Inc.as the contractor.As the rain says Brown and Caldwell project <br /> increased,it became clear that manager Linda Danco in Atlanta. <br /> the Flint River,normally 1,600 "Nobody lives there anymore. <br /> feet east of the plant,would The devastation to the communi- <br /> overtake its banks with the crest ty was incredible." -- <br /> expected to occur July 9. <br /> To prepare for the pending Regulators waive <br /> flood,Brown and Caldwell's $100,000 in fines - <br /> Herman Alford oversaw the When the city of Colorado <br /> contractor's effort to secure the Springs,Colo.,was about to be _ <br /> site.This effort included filling hit with over$100,000 in fines _ - <br /> concrete structures under bemuse its wastewater treatment <br /> construction(piping and a plant had exceeded National <br /> chlorine-contact facility)with Pollutant Discharge Elimination <br /> water hoping the additional System(NPDES)permit limits <br /> weight would prevent them for silver,Brown and Caldwell _ <br /> from floating away in the flood- acted fast to help the city avoid <br /> water.The contractor also the penalty. <br /> moved stored materials and The city was notified by the <br /> trailers out of the flood's path, state that it would be cited for <br /> and the city and its maintenance discharging too much silver into • .n• <br /> contractor removed motors from Fountain Creek,exceeding the <br /> existing wastewater facilities to NPDES limit of 1.2 parts per bil- --_ <br /> prevent them from being lion.The city requested and won <br /> damaged. a 30-day delay from the state reg- <br /> Meanwhile,several people ulators to collect data necessary _ <br /> from Brown and Caldwell's to support its case.Then the city - <br /> Atlanta office attempted to travel turned to Brown and Caldwell <br /> to Albany to help the efforts,but for help. Brovin and Caldwelleregulatorsto <br /> roads were closed and they were During that 30-day period, ' ' <br /> s'metals limits. <br /> prevented from making the trip. engineers worked with the city <br /> When the river crested,it to design an intensive plant was thrilled with the outcome; guidance from the U.S. <br /> reached as many as two miles monitoring program which the says Cynthia Paulson,project Environmental Protection <br /> to the west of the treatment city staff worked around the manager."We met with the state Agency,which accounts for <br /> plant.By that time,Alford,the clock to implement. that morning,and they called the metal bioavailability.By showing <br /> city,and the construction and Brown and Caldwell evaluat- city that afternoon to say they that silver discharges to the <br /> maintenance contractors bad ed the data,did some modeling had reversed their position.Both creek were not affecting aquatic <br /> secured the site as much as pos- using TOXCHEM,and pulled the state and the EPA were life(only a fraction of the silver <br /> sible.Two days after the crest, together a presentation that incredibly responsive on this is available to the organisms), <br /> when Alford surveyed the site for showed regulators the violations issue.They[state officials] said Brown and Caldwell and the city <br /> flood damage,he spent most of were temporary:They were the technical work was very per- convinced regulators to consider <br /> the day in a boat. caused by a partial plant shut- suasive and made it an easy deci- a future increase in the silver <br /> About five days after the river down to allow for construction. sion.It was very rewarding to limit by a factor of over three. <br /> crested,the city was able to Since the plant was being work together with city staff on The increase could be imple- <br /> return the motors to the plant upgraded,and Brown and this project—we joined forces to mented by Jan. 1,1995. <br /> and start primary treatment Caldwell could show that the meet a very demanding deadline This project marks the fust <br /> again.Brown and Caldwell plant wouldn't have exceeded the and achieved all our goakP time in Colorado that the new <br /> helped by providing information limits otherwise,the city quali- Brown and Caldwell also metals guidance from EPA had <br /> on areas of the plant to bring up fied for a bypass exemption from helped the city perform some been applied,and EPA Region <br /> first and where to look for prob- the NPDES limits and all fines related work which showed state VIII officials are planning to use <br /> lems.Much of the flood recovery were dropped. regulators the city's metals limits the approach as a prototype, <br /> information was first developed "The city of Colorado Springs were too low,based on new says Paulson. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.