My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003074
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MADRUGA
>
200
>
2600 - Land Use Program
>
SA-93-42
>
SU0003074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:39 AM
Creation date
9/6/2019 9:58:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003074
PE
2633
FACILITY_NAME
SA-93-42
STREET_NUMBER
200
Direction
E
STREET_NAME
MADRUGA
STREET_TYPE
RD
City
LATHROP
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
200 E MADRUGA RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MADRUGA\200\SA-93-42\SU0003074\APPL.PDF \MIGRATIONS\M\MADRUGA\200\SA-93-42\SU0003074\CDD OK.PDF \MIGRATIONS\M\MADRUGA\200\SA-93-42\SU0003074\EH COND.PDF \MIGRATIONS\M\MADRUGA\200\SA-93-42\SU0003074\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LATE REVISIONS <br /> FOR <br /> CITY OF LATHROP AND CROSSROADS SANITARY CORPORATION <br /> TENTATIVE WASTE DISCHARGE REQUIREMENTS <br /> June 17, 1994 <br /> Findings <br /> Finding No. 6 will be changed to the following: <br /> This Order will establish requirements for the Phase I - Phase III flow and disposal <br /> capacities. <br /> Discharge Specification <br /> Discharge specification B.1. will be changed to the following: <br /> The monthly average dry weather discharge flow shall not exceed the Phase I disposal flow <br /> of 0.2 million gallons/day. Upon construction completion of the Phase 11 disposal ponds, <br /> the monthly average dry weather discharge flow shall not exceed 0.4 mgd. Upon <br /> construction completion of the Phase III disposal ponds, the monthly average dry weather <br /> discharge shall not exceed 0.6 mgd. <br /> Provision <br /> The following new Provision E.15. will be added: <br /> Before exceeding the average dry weather flow of a construction phase, the Discharger <br /> shall submit a certification signed by a California registered civil engineer,certifying that <br /> the wastewater disposal pond construction has been completed for the next phase and that <br /> the plant is capable of meeting waste discharge requirements for the higher average dry <br /> weather flows. <br /> Information Sheet <br /> The first sentence of the second paragraph of the Information Sheet will be changed to the <br /> following: <br /> These Waste Discharge Requirements will allow discharge and disposal for the anticipated <br /> flows associated with all phases of the construction efforts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.