My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009099
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
25
>
2600 - Land Use Program
>
PA-1200032
>
SU0009099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:51 AM
Creation date
9/6/2019 9:59:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009099
PE
2611
FACILITY_NAME
PA-1200032
STREET_NUMBER
25
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
MOUNTAIN HOUSE
APN
20904018 19
ENTERED_DATE
3/15/2012 12:00:00 AM
SITE_LOCATION
25 E MAIN ST
RECEIVED_DATE
3/13/2012 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\25\PA-1200032\SU0009099\APPL.PDF \MIGRATIONS\M\MAIN\25\PA-1200032\SU0009099\CDD OK.PDF \MIGRATIONS\M\MAIN\25\PA-1200032\SU0009099\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. MOUNTAIN HOUSE COMMUNITY SERVICES(Staff Contact: Morgan <br /> �- Groover, 209-831-5666) <br /> GENERAL <br /> 1. All subdivision improvements shall be in conformance with Community Approvals, including, <br /> but not limited to, subdivision improvement plans and specifications, the latest Improvement <br /> Standards and Specifications of the Mountain House Community Services District(MHCSD), <br /> the Design Manual, Master Plan, Specific Plan II, master utility plans, and other standards <br /> and plans adopted by the MHCSD. These improvement plans and specifications must be <br /> approved by the MHCSD prior to approval of each phased Final Map or before any work is <br /> commenced. <br /> 2. The developer shall comply with all requirements of EIR, SP II, and SP II Initial Study, <br /> including, but not limited to, County, State and Federal requirements relative to air quality, <br /> storm water discharge, waste disposal and hazardous waste. Any reference to Standards <br /> used in these Conditions of Approval shall be interpreted to be the MHCSD Standards in <br /> effect at the time of the improvement plan final submittal and approval to the extent that such <br /> standards do not conflict with the MARA. <br /> 3. MHCSD Master Restrictions shall be recorded on the property concurrently with the <br /> recordation of any final map. <br /> 4. Prior to submitting any Final Map the applicant shall prepare a Town Center Community <br /> Facilities Plan. The Plan shall determine the location, size, character and use of all <br /> Community Facilities to be constructed in the Town Center and demonstrate that the <br /> Facilities are in compliance with Community Approvals. The Plan shall be approved by <br /> MHCSD prior to the submittal of any Final Map for the Town Center. The Town Center <br /> Community Facilities Plan shall include the Mountain House Creek conceptual design from <br /> Central Parkway Bridge to Byron Road Bridge.The architecture of buildings and open <br /> spaces shall comply with the town center guidelines. Maintain multiple story mixed use <br /> concept. <br /> 5. All required onsite and offsite easements and dedications shall be offered to the MHCSD <br /> through offers of dedication to the MHCSD or shall be recorded on the Final Map. <br /> Dedication of public rights-of-way shall be in conformance with the adopted Public Land <br /> Equity Program (PLEP). A 6 feet minimum PUE shall be dedicated on all property adjacent <br /> to any public roadway or adjacent to any joint trench or other public utilities or as otherwise <br /> approved by MHCSD. Any easements to be abandoned that belong to an irrigation district <br /> shall not be abandoned without prior approval of that district. <br /> 6. All costs incurred by the MHCSD for any applicant development project shall be paid by the <br /> applicant in accordance with the MHCSD Development Project Fees for Services <br /> Agreement, dated October 9, 2009, between MHCSD and Shea Mountain House LLC. or a <br /> later development agreement between MHCSD and the developer. <br /> 7. Except where provided otherwise in a Project Acquisition Agreement or Project <br /> Reimbursement Agreement, prior to the recording of any Final Map, all infrastructure <br /> facilities outside the boundary of the Tentative Map (water, sewer, storm drainage, electric <br /> power, natural gas,telephone, communications, etc.)necessary to serve the Town Center <br /> shall be in place and fully operational. Any deferral of any improvements shall be approved <br /> by MHCSD and will require the developer to provide the MHCSD a bond or other forms of <br /> security approved by MHCSD, insuring the eventual construction of the facility. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.