My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009099
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
25
>
2600 - Land Use Program
>
PA-1200032
>
SU0009099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:51 AM
Creation date
9/6/2019 9:59:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009099
PE
2611
FACILITY_NAME
PA-1200032
STREET_NUMBER
25
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
MOUNTAIN HOUSE
APN
20904018 19
ENTERED_DATE
3/15/2012 12:00:00 AM
SITE_LOCATION
25 E MAIN ST
RECEIVED_DATE
3/13/2012 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\25\PA-1200032\SU0009099\APPL.PDF \MIGRATIONS\M\MAIN\25\PA-1200032\SU0009099\CDD OK.PDF \MIGRATIONS\M\MAIN\25\PA-1200032\SU0009099\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A: Consistency Review with Adopted Plans <br /> A summary of consistency is presented below. <br /> General Plan Consistency <br /> The proposed Tentative Map for the Town Center("project")has been reviewed for consistency <br /> with the General Plan. The consistency review conducted by staff found that it met General Plan <br /> requirements for orderly and compact development(i.e., compatible siting of land uses within, and <br /> adjacent to,the proposed development of the Town Center;inclusion of multi-family housing,which <br /> includes for sale condominium units and apartment units and Additional Town Center Units; and <br /> coordination of land uses with transportation, protections for public health and safety(i.e., <br /> improvements planned to protect residents from 100-year flood events and provisions for police and <br /> fire service), and protections for the fiscal health of the County. Staff has also found that the <br /> proposed subdivisions are consistent with General Plan policies since: 1)the infrastructure planned <br /> meets the requirements and standards of the County and the MHCSD;2)all on-site and off-site <br /> improvements, and easements and dedications,will be constructed; 3)the requisite will-serve <br /> letters from the MHCSD have been obtained;4)equitable financing mechanisms for urban services <br /> have been established; 5)significant environmental impacts, identified in the Mountain House <br /> Master Environmental Impact Report(WEIR"), have either been addressed as mitigations in the <br /> MEIR and Initial Study, as mitigations(in whole or part)in the Master Plan,TDM Plan, and the <br /> Mountain House Development Title,or as conditions of approval in the project; 6)adequate school <br /> facilities will be made available as needed; 7)waste management services meeting the <br /> requirements of the MHCSD will be provided;8)recreational,transportation, and other <br /> improvements will be coordinated and provided in accordance with County and MHCSD timing <br /> requirements; 9)energy resources will be conserved and air pollution minimized by means of <br /> participation in adopted plans (e.g.,TDM Plan)and the inclusion of public transit, bicycle, and <br /> L pedestrian facilities in project design; 10)transportation improvements, adequate to serve the <br /> proposed project,will be constructed;and 11)programs and actions to ensure protection and <br /> preservation of riparian and other habitats and special status species(e.g., participation in the San <br /> Joaquin County Multi-Species Habitat Conservation and Open Space Plan [SJMSCP)),and the <br /> preservation of commercial agriculture(e.g. agricultural drainage and improvements phasing, right- <br /> to-farm protections, etc), either have been or will be implemented. <br /> Master Plan/Specific Plan II Consistency <br /> Staff has determined that the proposed project, as conditioned, is consistent with the Master Plan <br /> and Specific Plan It. Multi-use paths are proposed throughout the Town Center. Generous <br /> pedestrian sidewalks would be provided along streets and pedestrian connections would be <br /> constructed to Central Parkway and the Central Community Park. A transit center is proposed on <br /> a 3-acre parcel north of De Anza Boulevard between the Central Community Park and <br /> Community Commercial land uses. A transit stop is proposed along Main Street. Bus stop <br /> shelters are also proposed at a variety of locations within the Town Center, as warranted <br /> pursuant to the requirements of the MHCSD Transportation Demand Management(TDM)and <br /> Transit Plan. <br /> The proposed project is consistent with policies regarding the Affordable Housing Program,which <br /> includes policies requiring the availability of affordable housing for households at every income <br /> level, and reliance on market forces to determine the number, rents, and sales prices of dwelling <br /> units within the community. The proposed subdivision includes the construction of 200 for-sale <br /> homes or apartments at a density ranging from 14 to 60 units per acre and 240"Additional Town <br /> Center Units"as part of an affordable housing plan for the Town Center. <br /> The proposed project is consistent with policies regarding the Jobs/Housing Program. The <br /> projected number of jobs for the project, 2,649, is consistent with Master Plan and Specific Plan II <br /> assumptions regarding jobs per acre for specified land use types. A determination concerning <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.