My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009099
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
25
>
2600 - Land Use Program
>
PA-1200032
>
SU0009099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:51 AM
Creation date
9/6/2019 9:59:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009099
PE
2611
FACILITY_NAME
PA-1200032
STREET_NUMBER
25
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
MOUNTAIN HOUSE
APN
20904018 19
ENTERED_DATE
3/15/2012 12:00:00 AM
SITE_LOCATION
25 E MAIN ST
RECEIVED_DATE
3/13/2012 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\25\PA-1200032\SU0009099\APPL.PDF \MIGRATIONS\M\MAIN\25\PA-1200032\SU0009099\CDD OK.PDF \MIGRATIONS\M\MAIN\25\PA-1200032\SU0009099\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Master Plan or SPII amendments related to transportation are proposed by the project <br /> and no conflicts with these policy documents have been identified. <br /> Air Quality and Transportation Management. This chapter of the Master Plan addresses <br /> both the protection of air quality and the need for a Transportation Demand Management <br /> (TDM)program for the overall community. Air quality is addressed in Section 5.3 of this <br /> Initial Study. No major conflicts with this chapter of the Master Plan have been identified, <br /> and no policy changes for this topic are proposed by the applicant. <br /> Noise. This chapter of the Master Plan addresses mobile and stationary noise sources at <br /> Mountain House.The project does not propose any amendments to this chapter of the <br /> Master Plan, and no major conflicts with Master Plan policy have been identified. <br /> Potable Water Systems. This chapter of the Master Plan addresses water supply, water <br /> demand,water treatment, and water storage. Section 5.16, Utilities and Service <br /> Systems,of this Initial Study addresses water issues. No amendments are proposed for <br /> this chapter of the Master Plan and no policy conflicts have been identified. <br /> Wastewater Treatment and Collection System. This chapter of the Master Plan <br /> addresses wastewater generation and collection, treatment, sludge disposal, odors, and <br /> costs/permits. No amendments are proposed for this chapter of the Master Plan. This <br /> topic is covered in Section 5.16, Utilities and Service Systems, of this Initial Study. No <br /> policy conflicts have been identified. <br /> Storm Drainage and Flood Protection. The issue of storm drainage is addressed in <br /> Section 5.8, Hydrology and Water Quality, of this Initial Study. No amendments are <br /> proposed for this chapter of the Master Plan. No policy conflicts have been identified. <br /> `. Public Financing Plan Consistency <br /> The Master Plan requires that each discretionary Development Permit approval be consistent <br /> with the Public Financing Plan. The Mountain House Public Financing Plan sets forth principals <br /> and policies with which discretionary development approvals within the community must be <br /> consistent. Considerable fiscal and financial analysis has been prepared since the initial Public <br /> Financing Plan was approved to ensure that, as development occurs, mechanisms are in place to <br /> implement the objectives of the Public Financing Plan. The proposed project will be subject to <br /> the impact fees, monthly charges and special taxes that have been adopted to provide funding for <br /> the public facilities and services that are required to serve new development. Specifically, the <br /> proposed project is consistent with the Public Financing Plan for the following reasons: <br /> 1. Development within the Town Center would finance the pro-rata cost of infrastructure <br /> needed to serve them, through a combination of impact fees, monthly utility charges, <br /> special taxes and MHCSD special taxes. <br /> 2. Development would pay the cost of mitigating impacts on existing facilities, infrastructure <br /> and the environment. <br /> 3. Infrastructure costs would be allocated to properties within the project based on the <br /> principle of benefit received. <br /> 4. Mechanisms have been established to assure timely construction of public <br /> improvements, dedication of necessary public lands and rights-of-way, and <br /> reimbursement of disproportionate costs. <br /> The revenues generated to the County from development of the Town Center would offset the <br /> cost of public services to ensure that the project has a positive fiscal impact on the County. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.