My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4860
>
2600 - Land Use Program
>
PA-0400789
>
SU0005022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 9:13:30 AM
Creation date
9/6/2019 10:00:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005022
PE
2611
FACILITY_NAME
PA-0400789
STREET_NUMBER
4860
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
APN
173321004 TO 07
ENTERED_DATE
5/5/2005 12:00:00 AM
SITE_LOCATION
4860 E MAIN ST
RECEIVED_DATE
5/3/2005 12:00:00 AM
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sshih
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4860\PA-0400789\SU0005022\APPL.PDF \MIGRATIONS\M\MAIN\4860\PA-0400789\SU0005022\CDD OK.PDF \MIGRATIONS\M\MAIN\4860\PA-0400789\SU0005022\EH COND.PDF \MIGRATIONS\M\MAIN\4860\PA-0400789\SU0005022\EH PERM.PDF
标签
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v. A State National Pollutant Discharge Elimination System (NPDES) Construction Permit Notice of <br /> Intent(NOI)shall be filed with the State Water Resources Control Board if over one acre of total <br /> ground is disturbed. A Storm Water Pollution Prevention Plan (SWPPP)shall also be submitted to <br /> the County of San Joaquin Stormwater Division for approval. <br /> w. The applicant shall submit a plan to the County of San Joaquin Stormwater Division that addresses <br /> the on-site retention, infiltration, or treatment of the 85 percent runoff, per the County's Stormwater <br /> Quality Control Criteria Plan. <br /> x. The applicant/developer shall pay their"fair share'for the cost of signalizing Main Street and the <br /> State Route 99 northbound off-ramp intersection. The fail share amount is$10,000. <br /> y. The applicant/developer shall be required to place, if not already existing, a traffic signal at the <br /> intersection of Main Street and Wagner Avenue. <br /> z. The developer shall cause a disclosure notice approved by Public Works to be recorded against all <br /> properties within the proposed subdivision. This shall set forth the basis for current or proposed <br /> user fees and special assessment for public services to be provided within the proposed <br /> subdivision. <br /> 4. ENVIRONMENTAL HEALTH DEPARTMENT(Staff Contact: Raymond Borges, 468-3284) <br /> a. Written confirmation is required from Public Works that improvements have been constructed or <br /> financial arrangements have been made for any improvements for public sewer required by the <br /> agency. In addition, written confirmation from Public Works that the agency has or will have the <br /> sewer capacity to serve the development is also required. (Development Title Section 9-1100.3) <br /> b. Environmental Health requires connection to an approved public water supply system <br /> (Development Title Section 9-1120.2). A letter from the water supplier will be required which states <br /> that they have the capacity to serve the development and that the system meets State standards <br /> prior to recording the final map(Development Title Section 9-1100.3) <br /> 5. SAN JOAQUIN COUNCIL OF GOVERNMENTS (Staff Contact: Erin Sickler, 468-3913) <br /> a. This project is subject to the San Joaquin County Multi-Species Habitat Conservation and Open <br /> Space Plan (SJMSCP). Please contact SJMSCP staff regarding completing the following steps to <br /> satisfy SJMSCP requirements: <br /> (1) Schedule a SJMSCP biologist to perform a pre-construction survey prior to any ground <br /> disturbance. <br /> (2) Sign and return the Incidental Take Minimization Measures to SJMSCP staff(given to project <br /> applicant after the pre-construction survey is completed. <br /> (3) Pay the appropriate fee based on SJMSCP findings. <br /> (4) Receive the Certificate of Payment and release the required permit. <br /> 6. COUNTY PARKS AND RECREATION (Staff Contact: Jeff Smith, 953-8800) <br /> a. The collection of in-lieu fees for park development is required for approval of any new residential <br /> lots created in the proposed subdivision. (County Ordinance No. 9-1230-8) <br /> Conditions of Approval - 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.