Laserfiche WebLink
DRAFT <br /> September 27, 2005 <br /> MEMORANDUM <br /> TO: Chandler Martin,Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Rick Griffin <br /> FROM: Michael R. Callahan, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: PA-05-543 (REVISON 2)A MAJOR SUBDIVISION APPLICATION WITH VESTING MAP TO <br /> SUBDIVIDE A 14.7 ACRE PARCEL INTO 69 LOTS AND A 1.2 ACRE RETENTION BASIN, <br /> LOCATED ON THE NORTHWEST CORNER OF WALKER LANE AND MAIN STREET. <br /> (SUPERVISORIAL DISTRICT 2). <br /> PROPERTY OWNER: Rio Investments,LLC APPLICANT: Northstar Engineering Group <br /> ADDRESS: 5113 E.Main Street APN: 159-100-04 and 06 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Main Street has an existing right-of-way width of 80 feet and a planned right-of-way width of 84 feet. <br /> Homer Avenue has an existing right-of-way width of 50 feet(20 feet south of centerline)and a planned <br /> right-of-way width of 50 feet. Walker Lane has an existing right-of-way width of 40 feet and a planned right-of- <br /> way width of 50 feet. <br /> The Traffic Impact Mitigation Fee will be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee will be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br /> The Reeional Traffic Impact Fee will be required when parcels are developed. The fee is due and payable at the <br /> time of buildine permit application. <br /> The applicant shall complete the following requirements before the Department of Public Works can support or <br /> deem complete the application for this project: <br />