Laserfiche WebLink
..1 <br /> Chandler Martin -3- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-05-543 (SU) <br /> 8. Adjustment to improvements shall be made to provide for two-way traffic and for temporary cul-de-sacs as <br /> well as utility systems modification to conform to County Standards where subdivision is to be recorded in <br /> phases. <br /> 9. All utilities shall be underground except power transmission facilities of a 35 KV or greater. Public utility <br /> easements shall be provided along the road frontage of the subdivision and as required by the public utility <br /> companies. (Development Title Section 9-1155.2) <br /> 10. Street"A", Street"B", Street"C", and Court"D" shall be dedicated on the Final Map and improved to <br /> County Standards for a fifty(50)foot right-of-way local residential street. Street names shall be approved <br /> by the Community Development Department,prior to approval of the Improvement Plan or Final Map. <br /> (Development Title Sections 9-857.4, 9-1150.2[d][3] and 9-1150.5[b]) <br /> 11. Dedication to result in a forty—two (42)foot wide right-of-way from the centerline of Main Street to the <br /> property line shall be required on the Final Map and improved on the subdivided side to County Standards <br /> for an eighty-four(84) foot right-of-way minor arterial street. (Development Title Section 9-1150.5[b]) <br /> 12. Dedication to result in a twenty(25)foot wide right-of-way from the centerline of Walker Lane to the <br /> property line shall be required on the Final Map and improved on the subdivided side to County Standards <br /> for a fifty(50)foot right-of-way local residential street. (Development Title Section 9-1150.5[b]) <br /> 13. Dedication to result in a thirty(30)foot wide right-of-way from the centerline of Horner Avenue to the <br /> property line shall be required on the Final Map and improved on the subdivided side to County Standards <br /> for a sixty (60)foot right-of-way local collector street. (Development Title Section 9-1150.5[b]) <br /> 14. A terminal drainage system shall be provided to meet the requirements of the County and to provide <br /> adequate drainage for the subdivision. Strom drainage service shall be provided by CSA 41. <br /> (Development Title Section 9-1135.2) <br /> 15. The project shall be served by a public water system conforming to the requirements of the San Joaquin <br /> County Public Health Services Environmental Services Division and the Department of Public Works. The <br /> system shall provide adequate domestic and fire water supply in conformance to the requirements of the <br /> County Fire Warden and the local Fire District. Water service shall be provided by Calwater. Atest wdf <br /> (Development Title Section 9-1120.2) <br /> 16. The project shall be served by a public sewer collection and treatment system constructed in conformance <br /> with the requirements of the San Joaquin County Public Health Services Environmental Services Division <br /> and the Department of Public Works. Sanitary sewer service shall be provided by City of Stockton. A <br /> (Development Title Section 9-1105.2) <br />