Laserfiche WebLink
r l ll <br /> ZONE RECLASSIFICATION v <br /> T ..oma <br /> 2: y <br /> H SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> • c�•.. �P• BUSINESS PHONE: (209)468-3121 <br /> iFoaN BUSINESS HOURS: 8:00 A.M. TO 5:00 P.M. .(Monday through Friday) <br /> APRLICATIUR PROGES�IIVG STEPS. r z _� "' .. <br /> STEP 1 CHECK WITH STAFF—Development Services Staff will explain the requirements and procedures�to�you. <br /> STEP 2 SUBMIT YOUR APPLICATION—When you,apply, file all of the following: <br /> FEE The staff will let you know the current cost of filing an application. Make checks are payable to the San <br /> Joaquin County Treasurer. <br /> FORM Ten(10)copies of the completed application information forms(attached)which all owners must sign. <br /> • MAP Ten(10)copies of the assessor page(s)with the area to be rezoned outlined. Label the map with both the <br /> "existing"and"proposed"zoning of thelplan. <br /> • DEED One copy of the recorded deed(s)of thI property. <br /> • SERVICES If your project requires connection to public facilities,you must submit a"will-serve"letter from the <br /> appropriate water,sewer or drainage entities at the time of filing. This letter must include a statement from <br /> the agency that they will serve the propose d development,and have,or will have,the capacity to provide <br /> such service. Irr <br /> • SOIL SUITABILITY If the proposed method of sewage disposal is on-site,and this is permissible,submit a Soil <br /> STUDY Suitability Study prepared to the specfications of the Environmental Health Division. Submit this study to <br /> the Environmental Health Division prior to submitting this application. <br /> APPLICATION Staff will check your application. If anything is missing,you will be notified in writing.The applicant will <br /> COMPLETE be sent a postcard once the application has been determined complete. (Your application cannot be <br /> processed until it is cpm tete.) III <br /> STEP 3 APPLICATION PROCESSING <br /> • PREAPPLICATION A preapplication conference may be required for a proposed Zone Reclassification if the size,location, <br /> CONFERENCE or complexity warrant. Check with the staff to see if a preapplication conference will be required prior to <br /> submitting a full application. <br /> • CEQA The County will decide f the proposal will have an adverse effect on the environment. If there are no <br /> adverse effects,the application will be processed. If there are potential adverse effects,further <br /> environmental review will be required. Projects that have the potential to adversely effect the environment <br /> will require the preparation of an E.I.R. {This may extend the processing time. <br /> • REFERRALS Staff will refer the application to any County departments,other agencies and surrounding property <br /> AND ACTION owners affected by your proposal. At the end of a review and comment period a staff report will be prepared <br /> and the Planning Commission will hold a public hearing. If the Commission can make the required findings, <br /> the application will be approved. Typically action will be taken by the Commission within 8 weeks after <br /> application. 11 <br /> • FINAL ACTION The action of the Commission can be appealed to the Board of Supervisors. The Commission's action is <br /> final unless appealed. For further information on the length of the appeal period,contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS - The staff will send you the final action and if it is approved it will list conditions, by department that must be <br /> met before you can file a parcel map. <br /> • SANITATION AND Projects that will utilize on-site sanitatio disposal and/or on-site wells, must obtain permits from the <br /> WELL PERMITS Environmental Health Division. 0 <br /> • BUSINESS If the project involves a business,a Business License must be approved prior to starting operation. <br /> LICENSES Business License applications can be processed concurrently with the site Approval application. - <br /> I <br /> • BUILDING PERMITS If the project involves construction,a Building Permit must be approved prior to commencement of work. <br /> • OTHER PERMITS Frequently other local,state and/or federal agencies will require permits for land use projects(e.g.Air <br /> Pollution Control District, Regional Water Quality Control Board or the Sheriffs Office). The Community <br /> Development Department will identify additional permits we are aware of that may be required for your <br /> project. <br /> F:\DEVSVS\Planning Applioetlon Forms�ZONE RECLASSIFICATION Page 1 of 5 <br /> (Rev.04-25-05) <br />