Laserfiche WebLink
%Novo .� <br /> Raymond Hoo -2- <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> PA-07-315(SA) <br /> 4. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is $830.00 per 1000 gross equivalent square foot of <br /> building based on daily trip generation. The fee is based on the current schedule. (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Dischargers whose project disturb I or more acres of soil or whose projects disturb less than I acre but are <br /> part of a larger common plan of development that is total disturb 1 or more acres, are required to obtain <br /> coverage under the General Permit for Dischargers of Storm Water Associated with Construction Activity <br /> (Construction General Permit, 99-08-DWQ). Construction activity subject to this permit includes clearing, <br /> grading and disturbances to the ground such as stockpiling, or excavation, but does not include regular <br /> maintenance activities performed to restore the original line, grade, or capacity of the facility. <br /> MRC:BD:av <br /> P:\COWA S\SA\Y 2007\PA-0700315 APPLICATl AOC <br />