My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004564
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
12833
>
2600 - Land Use Program
>
GP-01-13
>
SU0004564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:54 AM
Creation date
9/6/2019 10:05:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004564
PE
2691
FACILITY_NAME
GP-01-13
STREET_NUMBER
12833
Direction
S
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
LATHROP
ENTERED_DATE
7/21/2004 12:00:00 AM
SITE_LOCATION
12833 S MANTHEY RD
RECEIVED_DATE
8/28/2001 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MANTHEY\12833\GP-01-13\SU0004564\APPL.PDF \MIGRATIONS\M\MANTHEY\12833\GP-01-13\SU0004564\CDD OK.PDF \MIGRATIONS\M\MANTHEY\12833\GP-01-13\SU0004564\EH COND.PDF \MIGRATIONS\M\MANTHEY\12833\GP-01-13\SU0004564\BP REL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sent By: RWOCB; , 2553439; Mar-7 ,? 6:50; Page 2/2 <br /> .� California Regional Water Quality Control Board <br /> Central Valley Region <br /> Robert Schneider,Chair <br /> Winston EL nicko: - --- -- Gray Davis <br /> 5eereroryfor S2crameot0 Main Office Governor <br /> Eavrronmental Internet Address: hitp:liw ..w b.".gov/mgcb5 <br /> Protection 3443 Routicr Road.Suite A.Sacramento,Cnlifomia 95627-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> 5 March 2002 <br /> Tony Arnaiz <br /> Central Valley Construction <br /> PO Box 830 <br /> Lathrop, CA 95330 <br /> REVIEW ADDITIONAL CIL4RACTERI7ATION/REMEDIATION PROPOSAL, <br /> CENTRAL VALLEY CONS TR UCTION, 146 KLO ROAD,LATHROP,SAN JOA QUIN CO UNTY <br /> I reviewed the 28 February 2002 Additional CharacterizationlRemediation Proposal(Workplan)submitted by <br /> John Cummings&Associates(JCA)on behalf of Central Valley Construction. The Workplan includes a scope <br /> of work to complete the following items as requested in our 8 February 2002 letter: <br /> Groundwater monitoring and sampling. <br /> • A well receptor survey within 2,000 feet of the site. <br /> An investigation to define the lateral and vertical extent of soil contamination near the former above <br /> ground storage tank. <br /> All data will be submitted in a report of findings summary report. The Workplan is approved as submitted. All <br /> work must be completed in accordance with State and local laws.including obtaining appropriate permits. Please <br /> notify me at least five business days prior to any site work or sampling. If you have any questions or comments, <br /> please <br /> call me at(916)255-31155. <br /> Marty Hartzell,R.G. <br /> Associate Engineering Geologist <br /> cc: Mr. Sam Savig, San Joaquin County Public Health Services,Stockton <br /> Mr. John Cummings,John Cummings&Associates,Fremont <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br /> 7— energy challenge facing Califomie is real. Every Califomiao needs to take immediate action w reduce eacrgyooasampti0n <br /> For a fiat of sirriple ways you can reduce demand and cut your energy costs,see our web-site at hnpl/wwwswrcb.ca.gov/twgeb5 <br /> wa <br />
The URL can be used to link to this page
Your browser does not support the video tag.