My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004688
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
12833
>
2600 - Land Use Program
>
PA-0400646
>
SU0004688
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:06 AM
Creation date
9/6/2019 10:05:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004688
PE
2626
FACILITY_NAME
PA-0400646
STREET_NUMBER
12833
Direction
S
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
LATHROP
APN
19123007
ENTERED_DATE
11/3/2004 12:00:00 AM
SITE_LOCATION
12833 S MANTHEY RD
RECEIVED_DATE
11/2/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MANTHEY\12833\PA-0400646\SU0004688\APPL.PDF \MIGRATIONS\M\MANTHEY\12833\PA-0400646\SU0004688\CDD OK.PDF \MIGRATIONS\M\MANTHEY\12833\PA-0400646\SU0004688\EH COND.PDF \MIGRATIONS\M\MANTHEY\12833\PA-0400646\SU0004688\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chandler Martin -2- <br /> COMMENTS ON DEVELOPMENT <br /> PA-04-646(UP) <br /> Upon approval of the above requirement, the following conditions shall apply. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin County <br /> Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$690.00 per 1000 gross square foot of building <br /> designated as Manufacturing in the Lathrop area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1) acre of soil shall require a <br /> State National Pollutant Discharge Elimination System(NPDES)construction permit. <br /> MRC:DG:ar <br /> P:\CAMIdFMS\UAYR24G A-NON .,d <br />
The URL can be used to link to this page
Your browser does not support the video tag.