My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004688 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
12833
>
2600 - Land Use Program
>
PA-0400646
>
SU0004688 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:06 AM
Creation date
9/6/2019 10:05:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004688
PE
2626
FACILITY_NAME
PA-0400646
STREET_NUMBER
12833
Direction
S
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
LATHROP
APN
19123007
ENTERED_DATE
11/3/2004 12:00:00 AM
SITE_LOCATION
12833 S MANTHEY RD
RECEIVED_DATE
11/2/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MANTHEY\12833\PA-0400646\SU0004688\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> YSTEM OPERATIONAL PARAMETERS AND COMPONENTS - <br /> CHFIELD (E.L.F.) AREA TO SERVE THE NEW OFFICE BUILDING <br /> esign of the future pressurized filter bed disposal system for the facility are based <br /> pof efficient operation, disposal field longevity, and environmental protection. An <br /> overview of the system operation is as follows for the new Office Building: Influent waste from the <br /> building will gravity through a six-inch ABS tightline across the parking area for approx. 110 ft, into a <br /> single compartment 2,000 gal septic tank. The effluent will then gravity into a second, single <br /> compartment 2,000 gal tank. Lastly, the effluent will gravity into a third, two compartment 2,000 gal <br /> tank. The second compartment will be the pump chamber with a Biotube filter vault, duplex pump <br /> system to pressurize effluent, alternating between two filter bed cells, as depicted on the Site Plans. As <br /> referenced below, each filter bed cell is to be 10 ft wide, with the pressurized laterals situated 3.3 ft in <br /> from the edges of each bed. <br /> The filter beds and 100%reserve areas are to be installed in a proposed landscaped lawn area. It is our <br /> understanding this lawn area is to have gentle (2 ft height max) undulations which will cause the drain <br /> rock and laterals to "follow"these undulations. A hypothetical question arises regarding the potential <br /> of effluent percolating through the drain rock to "pool' at the lower elevations before percolating into <br /> the soil at the soil-effluent interface, since it is important the effluent be distributed equally throughout <br /> the filter bed. Reviewing the percolation and more particularly, the application rates described in <br /> Table 2 on Page 7,we find an application rate of 0.643 gallons/ftp/day that will theoretically occur at <br /> the soil-effluent interface. Although each dose volume is calculated below,this will ultimately be <br /> dependent upon the final float settings. If we take a maximum theoretical single dose of 350 gallons, <br /> deposited equally over one filter bed area of 950 sq ft(see below), the application rate is 350_950= <br /> 0.368 gallons/ft, which is 57%of resultant application rate test result. Consequently, pooling should <br /> not occur. <br /> E.L.F. SEPTIC TANKS <br /> Septic tanks store the accumulated sludge, scum and effluent (clear zone) volumes, which in tum <br /> affect treatment of nitrogen within the tanks. In the following calculation,the pump-out interval factor <br /> times the%vE time the peaking factor(PF) correlate the pump-out time interval in years with the <br /> recommended tank capacity. The peaking factor value for this project is estimated to be 2.5. <br /> Septic Tank Capacity Based on Puma-out Interval of One Year: <br /> Recommended tank capacity for a potential pump-out interval of one year after complete build-out: <br /> 1.6(pump-out interval factor)(QAVE) x Peaking Factor(PF=2.5) = 1.6 (1,586 gals/day) x 2.5 =6,344 gals. <br /> Total septic tank capacity=three - 2,000 gallon tanks=6,000 gallons. <br /> Detention Time: <br /> Detention Time=6_,000 gal total tank capacity x 0.70 (30%volume lost to sludge/scum accumulation) <br /> 2.5 (Peaking factor)x 1,586 gals/day(ADF) <br /> LDetentione= 1.1 days. The minimum acceptable detention time is 1.0 day. <br /> 17 <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.