My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006350 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
8853
>
2600 - Land Use Program
>
PA-0600651
>
SU0006350 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:21 AM
Creation date
9/6/2019 10:05:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0006350
PE
2691
FACILITY_NAME
PA-0600651
STREET_NUMBER
8853
Direction
S
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
FRENCH CAMP
APN
19320006
ENTERED_DATE
12/20/2006 12:00:00 AM
SITE_LOCATION
8853 S MANTHEY RD
RECEIVED_DATE
12/19/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MANTHEY\8853\PA-0600651\SU0006350\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F, <br /> February 28, 2007 <br /> NOA Project Number: E07023A <br /> ! 3.4 Future On-Site Sources of Nitrate <br /> 3.4.1 Quantity and Quality ofDomestic Wastewater From Proposed Project <br /> The following discussion is for determining the long-term waste water flow generated from the <br /> proposed construction for the nitrate loading analysis and should not be used for septic system <br /> design purposes. Typically,use estimates for the sizing of septic systems include a peak use factor, <br /> whereas the numbers discussed here are based on long-term averages. <br /> The maximum expected septic tank usage for the site will be from various buildings. An office <br /> building will have five to six people working with no customers. Six to eight.employees and no <br /> F1 customers will work at a repair shop on site.A dispatch building will have fou#people working, and <br /> there will be four people working at a washing facility. Forty to fifty truckers will be coming and <br /> going throughout the day. The facility will be open normal business hours, five days a week in the <br /> approximately eight winter months of November through June, and will be open six days a week ui <br /> _ the summer months,July though October. Several septic systems are being proposed for <br /> construction. <br /> The estimated sewage flow rates for use categories are available from a number of references. The <br /> uses presented below were guided by the San Joaquin County On-Site Wastewater Disposal Standards <br /> C"1 (2003), Crites and Tchobanoglous (1998), and EPA (1980). The references indicate that 13 gallons <br /> for each employee is typical for an office worker and 5 gallons for each truck driver. (Crites and <br /> rchobanogious, 1998). A shower is proposed in the repair shop which will serve a maximum of ten <br /> to fifteen people a day. <br /> The following table presents the septic waste water uses associated with the Site. The rates <br /> presented from the references provide general guidance but do not always reflect a match in usage. <br /> { Careful examination, professional judgement, and experience are necessary to select a reasonable <br /> flow rate estimate. The flow rates selected for the uses associated with this project are presented <br /> = next. <br /> 4 Table 1. <br /> Typical Quantity of Effluent <br /> Total People per Average Quantity per Average Daily Flow <br /> Category Day Person Per Parcel <br /> Shower 15 3 5gal/day/employee (15 employees*35 gpd) = 525 gpd <br /> Truckers 50 5 gal/day/trucker (50 truckers*5 gpd) = 250 gpd <br /> Employees 22 13 gal/day/employee (22 employees* 13 gpd) =286 gpd <br /> Total 1,061 gpd <br /> Note —gpd is gallons per day. <br /> P5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.