Laserfiche WebLink
J <br /> Raymond Hoo <br /> COMMUNITY DEVELOPMENT <br /> PA-07439 (SA) <br /> 1. A traffic study shall be required to determine the impacts and mitigation of the proposed project. The <br /> developer shall deposit funds with the County for all costs, as estimated by the Department of Public Works <br /> Transportation Planning Division,prior of Department of Public Works preparing or contracting for the <br /> required study. Any mitigation required by the traffic study shall be provided by the applicant. (Development <br /> Title Section 9-1150.4) ' <br /> 2. Applicant shall provide a written statement to the Department of Public Works stating whether surface <br /> Transportation Assistance Act (STAR) type trucks will be used as a part of the proposed operation. If STAA <br /> type trucks are to be used, a letter requesting designation of the propose facility as a STAA terminal will be <br /> required. <br /> Upon satisfaction of the above requirements, the following conditions of approval may apply. Additional and/or <br /> revised conditions of Approval may be necessary based upon factors resulting from the completed application. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin County <br /> Standards R-17,prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> 3. The frontage improvements for Manthey Road shall be constructed in conformance with the standards for <br /> one-half of a fifty(50)-foot right-of-way Rural Road,prior to finalization of Site approval. (Development <br /> Title section 9-1150.2) <br /> 4. The Traffic Impact Mitigation Feeshall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is $223.44 per additional daily trip-end generated in <br /> the Stockton area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 5. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is $1,390.00 per 1,000 gross square foot of building <br /> designated as Service Commercial. The fee is based on the current schedule. (Resolution R-06-38) <br /> 6. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. The fee currently is $651.00 per 1,000 gross square <br /> foot of building designated as Service Commercial. The fee shall be automatically increased on January 1 <br /> of each year through the year 2015 at the rate of 4.55 percent. (Development Title Section 9-818.4 and <br /> Resolutions R-91-327, R-94-185 and R-97-5) <br /> 7. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 8. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br />