Laserfiche WebLink
A10/17/2007 16: 29 12099487164 CALTRANS PAGE 02/03 <br /> STA7Ea�CAT,IFC?RMA—BII.SGN SS,:4:R4�Y:�Q�d' ONDIlousfNGAG��J.(Y A <br /> DEPARTMENT OF TRANSPORTATION <br /> E.O. BOX 2448 STOCKTON,CA 95201 <br /> (1976 F,.CHARTER WAX/1976 E.15R. MAR-fiig <br /> LUTHER KING 7R BLVD. 952.65) � <br /> TTY:California Relay ScMee(800)735-2929 . I <br /> PHONE (209)941-1921 FIPx your power! <br /> FAX 000)948-7194 Be energy ericieni! <br /> October 17, 2007 <br /> IO-SJ-5-PM 21.4 <br /> PA-0700439(SA) <br /> Silva Trucking <br /> Mo Hatef <br /> San Joaquin County <br /> Community Redevelopment Department <br /> Development Services Division ° <br /> 1810 East Hazelton Avenue <br /> Stockton, CA 95205 <br /> Dear Ms. Hatef <br /> The California Department of Transportation(Department) appreciates the opportunity to have <br /> reviewed the Site Approval application for a commercial facility for the storage,parking, repair, <br /> and washing of seventy tractors and/or trailers which includes the construction of five buildings. <br /> This project is to be located at 8853 S.Manthey Road in French Camp. The Department has the <br /> following comments: <br /> 1. The proposed project will generate enough traffic that a Traffic Impact Study(TIS) is <br /> necessary to analyze and determine the project's impact. In addition to a level of service <br /> analysis, the TIS needs to analyze the geometric requirements (tura-radius &storage) at the <br /> ramps and intersections that will be used for access by the project's generated truck traffic. <br /> a, A.traffic impact study(TIS) is necessary to determine this proposed project's near-term <br /> and long-term impacts to State facilities--both existing and proposed—and to propose <br /> appropriate mitigation measures. The Department recommends that the study be <br /> prepared in accordance with the Caltrans Guide far the Preparation of Trafe Impact <br /> Studies, dated December 2002 (Guide). The Guide is available online at the following <br /> web address:h ://www.dot.ca, ov / lanni tools/tools.htm. <br /> Please provide, in an electronic format, the traffic microsimulation software files(both <br /> input and output)that are used to develop the traffic impact study. The Department <br /> requires this infon-nation to provide a complete the review of the proposed project. <br /> 2. San Joaquin County and the proiect pmponcnt should be aware that the <br /> Interstate 5 (I-5)/Mathews Road off-"ramps and on-ramps do not meet Surface Transportation <br /> "Caltrans improves pnobain-across Cajffornra- <br />