My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002809
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
1748
>
2600 - Land Use Program
>
SA-98-33
>
SU0002809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:28 AM
Creation date
9/6/2019 10:06:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002809
PE
2633
FACILITY_NAME
SA-98-33
STREET_NUMBER
1748
Direction
S
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
11/1/2001 12:00:00 AM
SITE_LOCATION
1748 S MARIPOSA RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARIPOSA\1748\SA-98-33\SU0002809\APPL.PDF \MIGRATIONS\M\MARIPOSA\1748\SA-98-33\SU0002809\CDD OK.PDF \MIGRATIONS\M\MARIPOSA\1748\SA-98-33\SU0002809\EH COND.PDF \MIGRATIONS\M\MARIPOSA\1748\SA-98-33\SU0002809\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-98-33 <br /> 2. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $612 per 1,000 gross <br /> square foot of building as manufacturing in the Stockton area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record.) A credit will be allowed for the demolition of the four existing <br /> buildings. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The <br /> fee is due and payable prior to issuance of the building permit. The fee currently is $147 per <br /> additional 1,000 gross square foot of building as manufacturing. The fee shall be automatically <br /> increased on January I of each year through the year 2005 at the rate of 7.66 percent. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Improvement Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division ((209)468-3066)that this <br /> development has addressed the items on the attached Waste Plan Format for Development <br /> Projects. <br /> GK:R":gn <br /> M4F032.G2 <br /> E: Manuel Lopez, Deputy Director/Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.