Laserfiche WebLink
E. DRAINAGE <br /> 1. The natural drainage or fall will remain in the same direction and other run off <br /> wul uow to the pond. <br /> F. DISPOSITION OF OLD EQUIPMENT <br /> 1. No building of any type will be erected and the loader and screen will be <br /> c. t_ i r...._ Nothing transported hOIri the site upon completion of sand rcmo"val. ivouuhs fo remain <br /> on site. <br /> G. REVEGETATION <br /> 1. The area along the Shoreline of the pond 'Weil be planted in trees acid ui2 <br /> natural growth of grass, brushes etc.to create a habitat and guard against <br /> wind and water erosion. <br /> IT MONITORING AND MAINTENANCE. <br /> 1. Reeves Sand & Gravel,Inc. is the operator of the quarry for the sand removal <br /> and the property owner& Ducks Unlimited are to supervise and maintain the <br /> reclamation work. <br /> 1. ;'�T.2EAIvI NJLNI1 <br /> 1. There will be no in-stream mining for this project. <br /> J. FT M IRE MINING <br /> 1. There will not be any other excavating over this site. It will remain as a <br /> wetlands area. <br /> K. PUBLIC SAFETY <br /> 1. The pond area is in the middle of a large raneh well-off the nearest county <br /> road. Entrance is a dirt road and nobody has ventured onto the property as of <br /> yet. The site does not lie within one mile of a state highway bridge. The <br /> excavation will sit back 400 ft from the toe of Whiskey Slough levee, <br /> L WILLLkMI SON ACT <br /> 1. The project is to be completed in a little over two years. The acreage is 11.25. <br /> 2. The rehabilitatio.^, and. clwSiativri,will be an on-going operation. We will <br /> reclaim as much area as possible during the sand removal. <br /> 6 <br />