My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004117
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCDONALD
>
10450
>
2600 - Land Use Program
>
QX-98-0002
>
SU0004117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 2:41:49 PM
Creation date
9/6/2019 10:08:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004117
PE
2656
FACILITY_NAME
QX-98-0002
STREET_NUMBER
10450
Direction
W
STREET_NAME
MCDONALD
STREET_TYPE
RD
City
STOCKTON
APN
13106001
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
10450 W MCDONALD RD
RECEIVED_DATE
3/8/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\M\MCDONALD\10450\QX-98-02\SU0004117\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OX - - 002 <br /> G & G Farms <br /> P 0 sox 187 <br /> Holt, California 95234 <br /> July 25, 2002 <br /> San Joaquin County <br /> Community Development Department <br /> and <br /> State of California <br /> Department of Reclamation <br /> Dear Sirs: <br /> The proposed wet land area now under consideration is located in QX-98-2 and is in a <br /> area that has already been excavated under the original permit. All conditions and items <br /> of the original excavation permit have and do remain the same except for the proposed <br /> excavating of the wetlands pond consisting of ten acres. <br /> The information in the original Application for Quarry Excavation and the Reclamation <br /> Plan data still remain the same except for the following items. <br /> 1. There will be no removing or replacing of topsoil over the proposed pond area. <br /> 2. Excavating will enter into the ground water table. <br /> 3. Area over the pond will not need to be seeded, leveled etc. <br /> 4. Pond area will be planted with fish, and habitat area will have wild life, waterfowl <br /> 5. Creation of pond to be done in one phrase. <br /> The reclamation for Phrase 2 of QX 98-2 is underway and completion is expected around <br /> the end of September/October of this year or possibly sooner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.