Laserfiche WebLink
IMPACT MITIGATION RESPONSIBILITY TIMING <br /> 3. All water habitats and required buffers (Same as above) <br /> shall be shown on the Habitat Management <br /> Plan. <br /> 4. (See Mitigation A.3. above) <br /> 5. (See Mitigation A.4, above) <br /> 6. (See Mitigation A.S. above) <br /> 7. (See Mitigation A.6. above) <br /> B. Water levels In the open water habitats Developer Prior to the recordation of the <br /> shall be maintained and be noted in the Parcel Map. <br /> Habitat Management Plan. <br /> D. Potential cumulative loss of 1. The maximum amount of construction Developer/CDD Prior to the recordation of the <br /> foraging habitat for Swalnson's (requiring building permits) for each parcel Parcel Map. Prior to Issuance <br /> hawks due to future land use shall be 25,000 square feet. Notes to that of building permits. <br /> changes. effect shall be placed on the Habitat <br /> Management Plan. <br /> 2. (See Mitigation A.S. above) <br />