Laserfiche WebLink
opoU.'N COUNTY OF SAN JOAQUIN THOMAS R. FUNN <br /> C -:Z-1 DEPUTY DIRECTOR <br /> w: .. ' :< DEPARTMENT OF PUBLIC WORKS <br /> R O.BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> -- STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> • L`+" ...-.. ''�P • 209/468-3000 STEVEN WINKLER <br /> /FOR- FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> September 20, 1999 <br /> MEMORANDUM <br /> en -n r-1\ /fin <br /> TO: Thomas M Gau, Senior Civil Engineer <br /> Community Development Department SEP 2 0 1999 <br /> CONTACT DERSON: Tina Wehrmeister <br /> FROM: Gabriel Karam, Senior Civil Engineer G l`' -ommunity Development Dept. <br /> Public Services Division <br /> SUBJECT: SA-99-64 A SITE APPROVAL APPLICATION TO RENOVATE AND EXPAND THE <br /> MOKELUMNE RIVER FISH HATCHERY AND ADMINISTRATIVE OFFICES, LOCATED <br /> AT TERMINOUS ON MCINTIRE ROAD, NORTH OF STATE HIGHWAY ROUTE 12, <br /> TWO MILES EAST OF STATE HIGHWAY ROUTE 88, EAST OF CLEMENTS. <br /> (DISTRICT 4). <br /> APPLICANT: East Bay Municipal Utility District Land Division APN: 023-010-01 <br /> INFORMATION: <br /> A portion of the site is currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. The 100-year Flood Elevation will be approximately 102 feet NGVD. <br /> McIntire Road has an existing right-of-way width of 45 feet and a planned right-of-way width of <br /> 50 feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $582.00 per <br /> 1,000 gross square foot of building as Manufacturing or $151.36 per additionally daily <br /> trip-end generated in the Lockeford area. The fee shall be automatically adjusted July 1 <br /> of each year by the Engineering Construction Cost Index as published by the Engineering <br /> News Record.) A credit may be given to existing buildings that will be demolished. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 2. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 3. Verification shall be obtained from the Solid Waste Division (468-3066) that this development <br /> has addressed the items on the attached Waste Plan Format for Development Projects. <br /> GK:RH:gn <br /> P 91095.G1C <br /> E: Manuel Lopez, Deputy Director/Development <br />