Laserfiche WebLink
° COUNTY OF SAN JOAQUIN <br /> _ y THOMAS M. GAU <br /> DEPUTY DIRECTOR <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810- 1810 E. HAZELTON AVENUE <br /> • �4<IFOR�`P STOCKTON, CALIFORNIA 95201 MANUEL SOLORIO <br /> 12091 468-3000 INTERIM DEPUTY DIRECTOR <br /> THOMAS R. FLINN FAX 12091 468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> January 22, 2002 <br /> MEMORANDUM RECEIVED <br /> TO: Kerry Sullivan,Deputy Director JAN Z 3 ?002 <br /> Community Development Department COII1MunitV DP,Vejor) ent Deui <br /> CONTACT PERSON: Jose Rubianes <br /> G.W. <br /> FROM: Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-01-97 A SITE APPROVAL APPLICATION FOR MANUFACTURING, COMPOSTING, <br /> WAREHOUSING, AND DISTRIBUTION FACILITY FOR LANDSCAPE PRODUCTS, <br /> LOCATED ON THE WEST SIDE OF MCKINLEY AVENUE, 1,800 FEET SOUTH OF EL <br /> DORADO STREET. <br /> (SUPERVISORIAL DISTRICT 1) <br /> APPLICANT: Sierra Organics Company APN: 193-020-09 <br /> INFORMATION: <br /> A portion of the site is currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. The 100 year Flood Depth will be approximately 1 Foot above natural ground elevation. In <br /> addition, the existing San Joaquin County and City of Stockton Flood Insurance Studies , which delineate flood <br /> risks, floodplain and floodway areas, are currently being reevaluated. The reevaluation is being conducted by <br /> the Federal Emergency Management Agency, Region DX, Building 105,Presidio of San Francisco, California <br /> 94129-1250, telephone(415) 923-7186. The reevaluation may delineate additional flood risks. The official <br /> flood maps are available for review at the Department of Public Works, 1810 East Hazelton Avenue, Stockton. <br /> These flood maps will be updated when the reevaluation process is completed. <br /> McKinley Avenue has an existing right-of-way width of 80-100 feet and a planned right-of-way width of the <br /> same. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br />