Laserfiche WebLink
. Vh <br /> �`may.COG <br /> z THOMAS R. FLINN P.O.BOX 1810-1810 E. HAZELTON AVENUE <br /> ! STOCKTON,CALIFORNIA 95201-3018 <br /> • DIRECTOR (209)468-3000 FAX(209)468-2999 <br /> '<IkopNJ w .co.san-joagwn.ca.us <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR ��,�yy...�,.,.�� <br /> MANUEL SOLORIO Warldn8 for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN MNKLER <br /> DEPUTY DIRECTOR T ' dal <br /> BENTON ANGOVE Co/p 5 7n1,75 <br /> BUSINESS ADMINISTRATOR "Unay <br /> eve%prnejrt�Epr <br /> April 12, 2005 <br /> MEMORANDUM <br /> TO: Chandler Martin,Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Rickfin <br /> FROM: Dean Gilman,Engineer IV A <br /> Public Services Division <br /> SUBJECT: PA-05-119 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE A 4.11 ACRE <br /> PARCEL INTO TWO PARCELS. PARCEL ONE TO CONTAIN 2 ACRES AND PARCEL <br /> TWO TO CONTAIN 2.11 ACRES,LOCATED ON THE WEST SIDE OF REID AVENUE, <br /> APPROXIMATELY 1700 FEET SOUTH OF COPPEROPOLIS ROAD. <br /> (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Salvador Garcia APPLICANT: Monte K. Seibel <br /> ADDRESS: 515 S. Meza Court APN: 183-320-87 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br /> The fire road shall be required to be improved in accordance with the requirements of San Joaquin County Fire <br /> Chiefs Association Standard 902.2.2. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. All easements of record shall be shown on the Parcel Map. (Development Title Section 9-910.20) <br /> 3. Drainage from each parcel shall be retained on-site by a retention basin (18-inch maximum depth). Drainage <br /> for each parcel shall be calculated by a registered civil engineer or an architect prior to recording of the <br /> Parcel Map.The required volume shall be noticed by a statement on the Parcel Map. The statement shall <br /> read "Drainage from each parcel shall be retained on-site by a retention basin and the required volume shall <br /> be ..." (Development Title Section 9-1135.9) <br />