My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012303
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHIGAN
>
2701
>
2600 - Land Use Program
>
PA-1900018
>
SU0012303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:43 AM
Creation date
9/6/2019 10:10:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012303
PE
2625
FACILITY_NAME
PA-1900018
STREET_NUMBER
2701
Direction
W
STREET_NAME
MICHIGAN
STREET_TYPE
AVE
City
STOCKTON
Zip
95204-
APN
10936003
ENTERED_DATE
4/30/2019 12:00:00 AM
SITE_LOCATION
2701 W MICHIGAN AVE
RECEIVED_DATE
6/12/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\M\MICHIGAN\2701\PA-1900018\SU0012303\APPL.PDF \MIGRATIONS\M\MICHIGAN\2701\PA-1900018\SU0012303\EH COND.PDF \MIGRATIONS\M\MICHIGAN\2701\PA-1900018\SU0012303\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: REQUEST FOR EXTEN. N OF THE EFFECTIVE PERIOD OF'- 3 DETERMINATION MUST <br /> BE E-FILED AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. AFTER RE-EVALUATION <br /> OF CURRENT OPERATIONS IN THE AREA OF THE STRUCTURE TO DETERMINE THAT NO <br /> SIGNIFICANT AERONAUTICAL CHANGES HAVE OCCURRED,YOUR DETERMINATION MAY BE <br /> ELIGIBLE FOR ONE EXTENSION OF THE EFFECTIVE PERIOD. <br /> This determination is based, in part, on the foregoing description which includes specific coordinates,heights, <br /> frequency(ies) and power. Any changes in coordinates,heights, and frequencies or use of greater power, except <br /> those frequencies specified in the Colo Void Clause Coalition; Antenna System Co-Location; Voluntary Best <br /> Practices, effective 21 Nov 2007, will void this determination. Any future construction or alteration, including <br /> increase to heights,power, or the addition of other transmitters,requires separate notice to the FAA.This <br /> determination includes all previously filed frequencies and power for this structure. <br /> If construction or alteration is dismantled or destroyed,you must submit notice to the FAA within 5 days after <br /> the construction or alteration is dismantled or destroyed. <br /> This determination does include temporary construction equipment such as cranes, derricks, etc.,which may be <br /> used during actual construction of the structure. However, this equipment shall not exceed the overall heights as <br /> indicated above. Equipment which has a height greater than the studied structure requires separate notice to the <br /> FAA. <br /> This determination concerns the effect of this structure on the safe and efficient use of navigable airspace <br /> by aircraft and does not relieve the sponsor of compliance responsibilities relating to any law, ordinance, or <br /> regulation of any Federal, State, or local government body. <br /> A copy of this determination will be forwarded to the Federal Communications Commission(FCC)because the <br /> structure is subject to their licensing authority. <br /> If we can be of further assistance,please contact our office at(424) 405-7643, or karen.mcdonald@faa.gov. On <br /> any future correspondence concerning this matter,please refer to Aeronautical Study Number 2019-AWP-40- <br /> OE. <br /> Signature Control No: 394769184-398356581 (DNE) <br /> Karen McDonald <br /> Specialist <br /> Attachment(s) <br /> Frequency Data <br /> Map(s) <br /> cc: FCC <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.