Laserfiche WebLink
1 <br /> Raymond Hoo <br /> COMMUNITY DEVELPMENT DEPARTMENT <br /> PA-06-371 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. (The fee currently is $771.00 per 1,000 gross square foot of <br /> building designated as manufacturing trip-end generated in the Lodi area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record.) (Resolutions 00-433) <br /> 4. The Regional Traffic Impact Fee may be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee currently is$780.00 per 1000 gross square foot of <br /> building. The fee is based on the current schedule. (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> In Rural Residential roadway A.C. dike shall be prohibited and the shoulder width shall be 6-feet <br /> wide. <br /> MRC:DG:av <br /> P-.�COMMEM�WR 20W6 A-0 37i wpd <br /> -2- <br />