Laserfiche WebLink
Queuing Analysis Worksheet <br /> Condition: Cumulative+Project Condition Cumulative+Project <br /> Time: Sunday Peak Hour Time: Sunday Peak Hour <br /> Location: Middle Road/Project Driveway 2 Location: Middle Road/Project Driveway 2 <br /> Movement: Northbound Left-Tum MovemerrNorthbound Right-Tum <br /> Movement Arrival Movement Arrival <br /> Capacity Rate RHO n P(x=n) P(xn) Capacity Rate RHO n P(x=n) P(xn) <br /> 232 1 180 0.78 P(0) 0.224 0.224 1086 420 0.39 P(0) 0.613 0.613 <br /> P(1) 0.174 0.398 P(1) 0.237 0.850 <br /> P(2) 0.135 0.533 P(2) 0.092 0.942 <br /> P(3) 0.105 0.638 P(3) 0.035 0.978 <br /> P(4) 0.081 0.719 P(4) 0.014 0.991 <br /> P(5) 0.063 0.782 P(5) 0.005 0.997 <br /> P(6) 0.049 0.831 P(6) 0.002 0.999 <br /> P(7) 0.038 0.869 P(7) 0.001 0.999 <br /> P(8) 0.029 0.898 P(8) 0.000 1.000 <br /> P(9) 0.023 0.921 P(9) 0.000 1.000 <br /> P(10) 0.018 0.939 P(10) 0.000 1.000 <br /> P(I1) 0.014 0.952 P(11) 0.000 1.000 <br /> P(12) 0.011 0.963 P(12) 0.000 1.000 <br /> P(13) 0.008 0.971 P(13) 0.000 1.000 <br /> P(14) 0.006 0.978 P(14) 0.000 1.000 <br /> P(l5) 0.005 0.983 P(15) 0.000 1.000 <br /> P(16) 0.004 0.987 P(16) 0.000 1.000 <br /> P(I7) 0.003 0.990 P(17) 0.000 1.000 <br /> P(18) 0.002 0.992 P(18) 0.000 1.000 <br /> P(19) 0.002 0.994 P(19) 0.000 1.000 <br /> P(20) 0.001 0.995 1 P(20) 0.000 1.000 <br />