My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002224 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MIDDLE
>
13400
>
2600 - Land Use Program
>
UP-96-02
>
SU0002224 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:07 AM
Creation date
9/6/2019 10:11:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002224
PE
2626
FACILITY_NAME
UP-96-02
STREET_NUMBER
13400
Direction
W
STREET_NAME
MIDDLE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21204002
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
13400 W MIDDLE RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MIDDLE\13400\UP-96-02\SU0002224\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 I r 1 1 r I r r r 1 r 1 1 r r r <br /> TBCUPM.CMO Ned Apr 22, 1998 14.55.24 Page 9-1TBCUPN.CMD Med Apr 22, 1998 14.55.24 Page 30-1 <br /> -------------------------------------------------_-------------------- ......____... <br /> ..-__........ <br /> .-----------------.----------------------------------- <br /> TRINITY BAPTIST CHUB® TRAFFIC STUDY TRINITY BAPTIST CHIRCH TRAFFIC STUDY <br /> BASE CONDITIONS . CUMULATIVE PM PBA[HOUR CONDITIONS BASS CONDITIONS . CUMULATIVE PM PEAK HOUR CONDITIONS <br /> PUTVBE CONDITIONS . CUMULATIVE PLUS P90J8CT PM PEAK POOR COWS. FUTURE CONDITIONS . CUMULATIVE PLUS PROJVC IN PEAR HOUR COMMON. <br /> ________________________________________________________________________________ ------------------------------------------- ------------------------------------ <br /> Level Of Service COmputatioa Report Level Of Service Cagmtation Report <br /> 1994 HCH Operations Method (Base Volume Alternative) 1994 MCM Operations Method (Future Volume Alternative) <br /> u.uuu.............a.......uu....uuuu..uuuu..uu......o.......... <br /> I.teuectioa B3 GRANT LING RD./NAGLBB W. Intersection 83 GRANT LINE RD./NAGLEE RD. <br /> u............u........a uuuuru.......r..*.................. .......... .................s♦.....♦..a.u.........rrrrr...r...ru...ru........r..0 <br /> Cycle (sac): 100 Critical Vol./Cap. (X). 0.359 Cycle (sac), 100 Critical Vol./Cap. (X). 0.359 <br /> Logia Time (sec). 0 (Y.R 4 fisc) Average Delay (sec/veh). 7.5 Was Time (sec)• 0 (Y.R . 4 sec) Average Delay (sac/veh). 7.5 <br /> optimal Cycle, 36 Level of Service, B Optimal Cycle, 36 Level Of Service. B <br /> r..........r.r..................u.............................................. ...............................................................r................ <br /> Approach. North Sound South Bound East Bound Meet Bound Approach, North Bound South Bound East Bound Nest Boum <br /> Movement' L - T - R L - T - R L - T - R L - T - R Movement. L - T - R L - T - R L - T - R L - T - R <br /> -------- ---- --------- ---- -------- ----- ---- C <br /> I- -------II---------------II- II- -------I I- II-------------II---------------II--------------1 <br /> Control, Split Phase Split phase Protected Protected Controls Split Phase Split Phase Protected Protected <br /> Rights. Include Include Include Include Right.. Include Include Include Include <br /> Min. Green. 0 0 0 0 0 0 0 0 0 0 0 0 Min. Green. 0 0 0 0 0 0 a 0 0 0 0 0 <br /> Lane.. 0 0 0 0 0 1 1 0 0 1 1 0 3 0 1 0 0 3 0 1 Lanes, 0 0 0 0 a 1 1 0 0 1 1 0 3 0 1 0 0 3 0 1 <br /> ------------I---------------II---------------II---------------II---------------I ------------I---------------IL_..-------...II---------------II---------------I <br /> Volume Module. Volume Module• <br /> Base Vol. 0 0 0 201 11 145 67 1100 150 0 420 191 Base Vol. 0 0 0 201 11 145 67 1100 150 0 420 191 <br /> Growth Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Grosth Adj, 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Initial Be.. 0 0 0 201 11 145 67 1100 150 0 420 191 Initial Bee. 0 0 0 201 11 145 67 1100 150 0 420 191 <br /> User Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Added Vol. 0 0 0 4 0 0 0 0 1 0 1 4 <br /> PHP Adj, 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 P....cayv.l: 0 0 0 0 0 0 0 0 0 0 0 0 <br /> PHP Volume, 0 0 0 201 11 145 61 1100 150 0 420 191 Initial Puts 0 0 0 305 11 145 67 1100 151 0 421 195 <br /> Reduct Vol. 0 0 0 0 0 0 0 0 0 0 0 0 User Adj, 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Reduced Vol. 0 0 0 201 11 145 67 1100 150 0 420 191 PHP Adj, 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> PCE Adj, 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHP Volum• 0 0 0 205 11 145 67 1100 151 0 421 195 <br /> MLP Adj, 1.00 1.00 1.00 1.05 1.05 1.00 1.00 1.10 1.00 1.00 1.10 1.00 Reduct Vol. 0 0 0 0 0 0 0 0 0 0 0 0 <br /> Final Vol.. 0 0 0 211 12 145 67 1210 ISO 0 463 191 Reduced Vol. 0 0 0 305 11 145 67 1100 151 0 421 195 <br /> ------------I---------------II---------------II---------------ll--------------- PCS Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.aU 1.00 1.00 1.00 <br /> Saturation Plots Modula. MLP Adj. 1.00 1.00 1.00 1.05 1.05 1.00 1.00 1.10 1.00 1.00 1.10 1.00 <br /> Sat/Lane, 1600 1600 1600 1600 1600 1500 1600 1600 1600 1600 1600 1600 Final Vol.. 0 0 0 215 12 145 67 1210 151 0 463 195 <br /> Adjustment, 1.00 1.00 1.00 0.85 0.85 0.85 0.95 1.00 0.65 1.00 1.00 0.85 ------------ --------------- ---------------II---------------II---------------I <br /> lease• 0.00 0.00 0.00 1.89 0.11 1.00 1.00 3.00 1.00 0.00 3.00 1.00 Saturation Floa Module. <br /> Final Sat.. 0 0 0 2574 146 1360 1530 4000 1360 0 4800 1360 Sat/Lana, 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 1600 <br /> ------------I---------------II---------------I ---------------II---------------I Adjustment. 1.00 1.00 1.00 0.85 0.65 0.85 0.95 1.00 0.85 1.00 1.00 0.85 <br /> Capacity Analysis Module, Lama. 0.00 0.00 0.00 1.89 0.11 1.00 1.00 3.00 1.00 0.00 3.00 1.00 <br /> Vol/Sat. 0.00 0.00 0.00 0.06 0.06 0.11 0.04 0.25 0.11 0.00 0.10 0.14 Final Sat.. 0 0 0 2576 144 1360 1520 4800 1360 0 4800 1360 <br /> Crit Moves. .... .... .... ------------1---------------11---------------II---------------II--------------- <br /> I <br /> Green/Cycle. 0.00 0.00 0.00 0.30 0.30 OJO 0.17 0.70 0.70 0.00 0.53 0.53 Capacity Analysis Module. .r <br /> Volume/Cap. 0.00 0.00 0.00 0.28 0.28 0.36 0.26 0.36 0.16 0.00 0.18 0.26 Vo1/8a1. 0.00 0.00 0.00 0.00 0.08 0.11 0.04 0.25 0.11 0.00 0.10 0.14 (` <br /> ------------1---------------11---------------II---------------II---------------I Crit Moven .••• •.•• •... <br /> Level Of Service Module. Green/Cycle, 0.00 0.00 0.00 0.30 0.30 0.30 0.17 0.70 0.70 0.00 0.54 0.54 <br /> Delay/Veh, 0.0 0.0 0.0 17.4 17.4 18.1 33.5 3.8 3.2 0.0 7.7 8.2 Volume/Cap, 0.00 0.00 0.00 0.38 0.28 0.36 0.27 0.36 0.16 0.00 0.18 0.37 <br /> User DelAdj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ------------I--------------- ---------------II---------------II--------------'I <br /> AdjDel/Veh. 0.0 0.0 0.0 17.4 17.4 18.1 23.5 3.8 3.2 0.0 7.7 8.2 Level Of Service Module, <br /> Queue. 0 0 0 5 0 3 2 13 1 0 7 3 Delay/Vah. 0.0 0.0 0.0 17.5 17.5 18.1 33.7 3.6 3.2 0.0 7.6 8.1 <br /> u.0 .................0«.««uuuo ............ruruu.ru......ru«u.. User DelAdj, 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Adj0e1/Veh• 0.0 0.0 0.0 17.5 17.5 10.1 33.7 3.8 3.2 0.0 7.6 8.1 <br /> Queue, 0 0 0 5 0 3 2 11 1 0 7 3 <br /> .............................vu................v..ovo...................u <br /> Ttaffl. 6.8.1511 (c) 1995 Dowling Assoc. Licensed to Omni.Meane, Roseville TraffiX 6.8.1511 (C) 1995 tattling A8o0C. Licensed to Om i.Means, Roseville <br />
The URL can be used to link to this page
Your browser does not support the video tag.