Laserfiche WebLink
2.3 Site Geology <br /> 2.4 Site Hydrology <br /> 3.0 SCOPE OF WORK <br /> Task 1 -Planning and Permits <br /> • Conduct a site background investigation. <br /> • Prepare and submit this project work plan to the the California Regional Water Quality <br /> _ Control Board (CRWQCB). <br /> • Prepare and submit a site specific Health and Safety Plan (HASP) to the CRWQCB. <br /> • Conduct a local water well survey to locate any domestic or municipal wells that may be <br /> impacted by any site contamination. <br /> • Obtain appropriate drilling permits. <br /> Task 2 -Monitoring Well Installation and Sampling <br /> • Install, develop, and sample three monitoring wells. <br /> • Submit ground water samples to a California State certified analytical laboratory for analysis <br /> of total nitrates and total dissolved solids by approved methodologies. <br /> ' Task 3 -Report Preparation <br /> • Interpret all laboratory sample analyses and field data. <br /> • Prepare site maps, drill logs, cross-sections and other documentation for the report. <br /> • Prepare a report utilizing a California Registered Geologist and Certified California <br /> _ Hydrogeologist in accordance with California State guidelines that presents all analytical data <br /> and interpretations. <br /> 4.0 PROJECT MANAGEMENT AND RESPONSIBILITIES <br /> 4.1 Project Manager <br /> Dr. Ross R. Grunwald will be assigned as project manager who will be responsible for <br /> the overall performance and compliance with applicable regulations, and the Health and <br /> Safety Plan guidelines. <br /> CA95DE-034 <br /> American Geological Services, Inc. <br /> 2 <br />