My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003011 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MIDDLE
>
14501
>
2600 - Land Use Program
>
SA-94-44
>
SU0003011 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:36 AM
Creation date
9/6/2019 10:11:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0003011
PE
2633
FACILITY_NAME
SA-94-44
STREET_NUMBER
14501
Direction
W
STREET_NAME
MIDDLE
STREET_TYPE
RD
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
14501 W MIDDLE RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MIDDLE\14501\SA-94-44\SU0003011\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmann a- <br /> Now <br /> A fire extinguisher shall be available within 50 feet of the work area during all <br /> operations. A first-aid kit suitable for hazardous waste sites will be located in the <br /> support zone; <br /> Contaminated personal protective equipment will not be removed from the site <br /> until properly cleaned, packaged, and labeled; <br /> All personnel entering the Exclusion zone wear the proper personal protective <br /> equipment as designated in the Project Health and Safety Plan. Such individuals <br /> shall be trained in the proper use and maintenance, and have been deemed <br /> physically fit by a licensed medical physician, to wear such equipment. All <br /> equipment shall be inspected prior to donning. For Level C and higher protection, <br /> gloves and boots shall be taped to protective clothing to ensure complete closure; <br />_ If unanticipated hazardous materials are observed, suspected, or personnel exhibit <br /> symptoms of distress, the Health and Safety Officer shall conduct an investigation <br /> to identify the material. Work may be halted and samples collected at the <br /> discretion of the Health and Safety Officer; <br /> The Project Manager, Health and Safety Officer, project personnel, and <br /> subcontractors shall periodically observe personnel for symptoms of distress. <br /> Symptoms of distress shall include the following: <br /> ° Changes in speech patterns; <br /> ° Nervousness or excitability; <br /> ° Changes in complexion, skin discoloration; <br /> ° Changes in disposition or demeanor; <br /> Signs of incoordination; <br /> ° Excessive salivation or pupillary response. <br /> All personnel are required to contact their supervisor, Project Manager, or Health <br /> and Safety Officer if they experience any ill effects, such as: <br /> ° Headache; <br /> ° Dizziness; <br /> ° Blurred Vision; <br /> ° Heat Stress; <br /> Irritation to eyes, mucous membranes, respiratory tract, or skin. <br /> All mechanical equipment shall be parked or stored in a safe location as <br /> designated by the Project Manager at the end of each workday. <br /> CA95DE-034 <br /> American Geological Services, Inc. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.