My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MILTON
>
24837
>
2600 - Land Use Program
>
PA-0500221
>
SU0004991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:23 AM
Creation date
9/6/2019 10:13:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004991
PE
2631
FACILITY_NAME
PA-0500221
STREET_NUMBER
24837
Direction
E
STREET_NAME
MILTON
STREET_TYPE
RD
City
ESCALON
APN
09314008
ENTERED_DATE
4/20/2005 12:00:00 AM
SITE_LOCATION
24837 E MILTON RD
RECEIVED_DATE
4/19/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MILTON\24837\PA-0500221\SU0004991\APPL.PDF \MIGRATIONS\M\MILTON\24837\PA-0500221\SU0004991\CDD OK.PDF \MIGRATIONS\M\MILTON\24837\PA-0500221\SU0004991\EH COND.PDF \MIGRATIONS\M\MILTON\24837\PA-0500221\SU0004991\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-05-221 (SA) <br /> 2. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 3. The driveway approach shall be improved in accordance with the requirements of San Joaquin County <br /> Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$179.44 per additional daily trip-end generated in <br /> the Linden area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record.) (Resolutions 00-433) <br /> 5. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is$238.00 per 1,000 gross square <br /> foot of building designated as Manufacturing. The fee shall be automatically increased on January 1 of <br /> each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 8. Tributaries of Potter Creek pass through the parcel. Therefore, the applicant shall keep these tributaries <br /> free of all obstacles which impede the flow of water and any alteration to these tributaries or any <br /> improvements to the access road bridge will require obtaining a Watercourse Encroachment Permit from <br /> San Joaquin County Department of Public Works. Furthermore, these tributaries shall be delineated with a <br /> 25-foot building setback from the top of both banks of the channels. <br /> Note: Any construction activity that results in the disturbance of at least one (1)acre of soil shall require a State <br /> NPDES construction permit. <br /> MRC:SH:ar <br /> PACOIM SISMYR 20DNA-W 22L.Pd - <br />
The URL can be used to link to this page
Your browser does not support the video tag.