Laserfiche WebLink
a.s � <br /> PA-0500221 (SA) ` <br /> May 6, 2005 <br /> Page 2 of 2 <br /> D. Construct water well under permit and inspection of the Environmental Health Department <br /> prior to occupancy. Should the number of non-resident individuals exceed 24 for at least 60 <br /> days per year, or the number of service connections exceed four, a yearly permit to operate a <br /> public water system will be required by the Environmental Health Department (San Joaquin <br /> County Development Title, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, and Health <br /> and Safety Code, Section 116525 through 116570. <br /> E. Submit three (3) sets of food facility plans to the Environmental Health Department for <br /> review and approval prior to issuance of building permit(s) (California Health and Safety <br /> Code, Section 113915). <br />